BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Texas City, Texas. Completed plans call for the renovation of a water / sewer project.

GCWA is investigating the use of automatic valve closure systems to provide added safety to the chlorine gas system. The Thomas Mackey water treatment plant utilizes (1) ton chlorine gas containers as part of the disinfection process. Automatic valve closure systems are actuators that mount directly onto the cylinder valve stem system. An automatic valve closure system is designed to provide 40 - 50 ft-lb of closing torque to the valve stem upon receipt of an emergency shutdown signal, stopping any leakage that may be occurring. The shutdown system is requested as an additional line of defense to an approved safety plan. It automatically shuts the primary isolation valves on the containers if a detectable gaseous chlorine leak is detected. The actuator mounts on the cylinder valve stem by means of a drive bushing and two parallel rods that straddle the gas valve nozzle making it easy to remove during cylinder changes. The actuator is designed to apply 40 ft-lb of closing torque to the valve stem after receiving an emergency shut down signal from any number of sources such as a chlorine gas detector. The actuator is designed as an emergency closure device and therefore is powered only in the closing direction. At the TMWTP, the actuators shall be installed on each of the one (1) ton chlorine gas cylinders designed for automatic closure of the valve. The actuator shall be tied into the chlorine gas detector installed within the chlorine gas building as well as the Emergency Shutdown Button and plant SCADA. In addition, Plant operators will utilize the actuators to close the valves during change out of the cylinders. Actuators shall be attached to the stem with the appropriate torque specs. The actuators shall be tested when installed on the new cylinders, which ensures that the actuators are operating according to design specification. The chlorine shut-off device protects the plant with associated chlorine system and equipment from accelerated corrosion caused by chlorine gas escape while the installation is unmanned. It also supplements and enhances the protection of operating personnel against exposure to chlorine gas.

Award

Water / Sewer

$243,300.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
206
Bidding Soon
4,011
All Active Projects
1,665
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2022

August 25, 2022

November 8, 2022

img_map_placeholder

4001 5th Ave N, Texas City, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.