BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Laconia, New Hampshire. Working plans call for site work for a road / highway; and for paving for a road / highway.

The City of Laconia reserves the right to accept or reject any and/or all proposals or any part thereof, to waive any formality in the process, and to accept the proposal considered to be in the best interest of the City. Failure to submit all information called for may be sufficient grounds for disqualification. The City of Laconia reserves the right to cancel this request at any time for any reason. DPW will identify street sections for crack sealing. The sections will be packaged into groups that support a day's worth of work for a crew. Traffic control will be provided or coordinated by the City. Payment will be based on completed work using the accepted unit of measure for the work. Proposers should provide prices for the following work period: o August 01, 2022 through May 31, 2023 Successful proposer will hold contract prices firm during the work period noted above. Upon acceptable completion of the first year services, as determined solely by the Director of Public Works, services may be extended for up to three (3) consecutive one year periods. The fees or compensation payable to the contractor for the second and subsequent years of the term shall be adjusted upward or downward to reflect changes in the cost of doing business as measured by fluctuations in the Consumer Price Index (CPI-U) published by the U.S. Department of Labor, Bureau of Labor Statistics, for the (Boston-Cambridge-Nashua, MA-NH), all urban consumers, not seasonally adjusted, all items. At the start of each new contract year and every year thereafter, the fees or compensation shall be increased or decreased in a percentage amount equal to the net percentage change in the said CPI-U. Beginning with the month of March in each succeeding year of this Agreement and every twelve (12) months thereafter, the net change in the said CPI-U shall be the change for the proceeding twelve (12) month period, based upon the March CPI-U of that contract year. .

Final Planning

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
67
Bidding Soon
1,049
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 10, 2022

img_map_placeholder

Multiple Locations, Laconia, NH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.