EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2022 at 8:00 PM

Updated September 14, 2023

Site work and renovation of a water / sewer project in Mosier, Oregon. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project generally consists of the construction of a groundwater well and pump station to support operation of the City's potable water system. The project scope will be completed in two parts. Part A of the project will include the drilling, development and regulatory approval of the proposed wellhead for potable water use. Part B of the project will include the construction and equipping of the well for connection to the City's water system, complete with site and utility improvements, mechanical electrical, and automatic control systems. The well pump station, herein referred to as the Water Source Improvements will be located within an easement on private property adjacent to Mosier Creek and Mosier Creek Road and near the City's existing Well No. 4 facility. The work includes furnishing all necessary labor, materials, equipment, tools, and guarantees to construct the Water Source Improvements as specified within the Contract Documents. About 0.4 miles up Mosier Creek Road from 3rd Street (Approx. Coordinates 45.6755, -121.3845). Failure to submit the required first-tier subcontractors list within the required two hours of the date and time for the receipt of bids will disqualify the bidder from further consideration. This project is public work and is subject to Oregon prevailing wage rates in accordance with ORS 297C.800 through 279C.870. This project is funded in whole or in part through the U.S. Department of Agriculture Rural Development, Rural Utilities Service. Special equal opportunity requirements imposed by that agency are contained in the bid documents, and bidders are cautioned to examine them carefully in preparing their bids. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Contractors must be qualified in accordance with the applicable parts of ORS Chapter 279C in order to enter into a contract with the Owner for public work in Oregon. Prequalification is not required, but bidders are required to complete a statement of bidder's qualifications on the forms provided. The Owner will investigate and determine the qualifications of the apparent low bidder as part of its evaluation of the lowest responsive and responsible bid. This project is a public works project subject to ORS 279C.800 - ORS 279C.870. No bid will be received or considered by the Owner unless the bid form contains, or is accompanied by, a statement by the bidder, as a part of the bid that the provisions required by ORS 279C.838 and 279C.840 pertaining to prevailing wages shall be included in this contract. Contractor licensing under ORS 468A.720 for asbestos abatement is not a requirement of this project. Each bid must contain a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120. Prior to submission of its bid, the bidder shall be registered with the Oregon Construction Contractor's Board in accordance with the provisions of ORS 279C.365, and thereafter comply with the requirements of ORS 701.005 to 701.137. Each proposal must be submitted on forms prescribed by the Owner and accompanied by a certified check, cashier's check or bid bond in an amount equal to 10 percent (10%) of the total amount bid. The successful bidder will be required to furnish a faithful performance bond and a labor and material payment bond each in the amount of one hundred percent (100%) of the amount of contract. Evidence of workers' compensation insurance will be required before the work shall commence. The Owner reserves the right to cancel this solicitation, reject any and all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375 (3) (b), and may reject for good cause any and all bids upon the Owner's finding that it is in the Owner's or the public's best interest to do so. The Owner reserves the right to waive informalities and to award a contract to the qualified lowest responsive and responsible bidder. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. Attendance at the pre-bid conference is encouraged but not required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$675,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Periodic Work Observation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Bowls
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
26
Bidding Soon
610
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

September 12, 2022

img_map_placeholder

Mosier Creek Rd, Mosier, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.