Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2022 at 8:00 PM
Updated September 14, 2023
Site work for a swimming pool in Boston, Massachusetts. Completed plans call for site work for a swimming pool.
The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9% The project consists of modifications to the existing swimming pool including installation of new walls, ramps, railings, and drains. Also, installation of new concrete deck, benches, shade shelters and PIP rubber surfacing at the adjacent spray deck area Olsen Pool Reconstruction:Modifications to the existing swimming pool including installation of new walls, ramps, railings, and drains. Also, installation of new concrete deck, benches, shade shelters and PIP rubber surfacing at the adjacent spray deck area. Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals.
Bid Results
Swimming Pools
$2,254,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 10, 2022
October 10, 2022
95 Turtle Pond Pkwy, Boston, MA
Related To This Project
Boston, MA
Bid Date: Aug 15 2022
Boston, MA
Bid Date: Aug 09 2022
Boston, MA
Bid Date: Aug 13 2022
Boston, MA
Bid Date: Jul 13 2022
Boston, MA
Bid Date: Jan 11 2022
Boston Convention and Exhibition Center - Emergency Expansion Joint Repair - Summer Street - 4229206
Boston, MA
Bid Date: Feb 05 2021
Boston, MA
--
Boston, MA
Bid Date: Aug 15 2022
Boston, MA
Bid Date: Jun 23 2022
Boston, MA
Bid Date: Aug 16 2021
Boston, MA
Bid Date: Aug 12 2022
Boston, MA
Bid Date: Aug 11 2022
Boston, MA
Bid Date: Aug 10 2022
Boston, MA
Bid Date: Jun 16 2022
Boston, MA
Bid Date: Aug 10 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
