Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Berkeley, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.
**As of November 14, 2024 project has not been awarded , Anticipated award date is on December 10, 2024 City Council Meeting .** Median and pedestrian refuge demolition and construction at four intersections, Curb ramp demolition and construction and associated sidewalk installation at two corners, Slurry seal and new pavement striping along approximately 1/2-mile of Sacramento Street (from Oregon Street to Fairview Street), Solar-powered Rectangular Rapid Flashing Beacon (RRFB) installation at three intersections, and Sign and delineator installation at seven intersections. More specifically, the Work consists of, but is not limited to, traffic control, coordination with utility companies and nearby residents, concrete and asphalt sawcutting and removal, protecting utilities in-place, removing and replacing existing monuments, removal of existing signs, removal of pavement striping, markings, and markers, adjusting utilities to finished grade, gutter modifications, installation of concrete medians and pedestrian refuge islands, installation of mountable median islands, reconstruction of curb ramps, slurry seal, installation of pavement markings, striping, markers, and curb paint, installation of RRFBs including poles, foundations, solar panels, push buttons, pull boxes, conduit, and conductors, and installation of new signs and posts. Refer to the Plans for a detailed description of the identified locations. Time of Work and Liquidated Damages: The City anticipates an approximately three-and-onehalf month period from the issuance of Notice of Award to the issuance of the Notice to Proceed. The Contractor shall commence work of construction under the contract within fifteen (15) working days following the effective date of the Notice to Proceed. The Notice to Proceed will be issued after the contract is fully executed. This work shall be diligently prosecuted to Substantial Completion before the expiration of 120 WORKING DAYS from the effective date of the Notice to Proceed, and to Final Completion before the expiration of 140 WORKING DAYS from the effective date of the Notice to Proceed. Questions concerning the anticipated work or scope of the project should be directed to Jesse Peoples, Associate Civil Engineer, via email at jpeoples@berkeleyca.gov, no later than5:00 P.M., Friday, September 27, 2024. Each proposal must be accompanied by an unconditionally certified or cashier's check or bid bond made payable to the City of Berkeley, and such check or bond shall be in an amount equal to at least 10% of the amount of the bid. Faithful Performance Bond in an amount not less than 100% of the amount of the contract, executed on the City of Berkeley Standard Performance Bond agreement form Labor and Material Bond in the sum of not less than 100% of the amount of the contract. The Council reserves the right to reject any or all bids or any combination of bid
Bid Results
Sidewalks / Parking Lot
$846,642.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2024
November 4, 2024
Sacramento St, Berkeley, CA
Related To This Project
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.