BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Kingston, Ontario. Completed plans call for the renovation of a laboratory facility.

Chillers - Two (2) existing Multistack chillers installed in the mechanical room are to be removed. Associated dry cooler on the roof is to remain and be reconnected to the new cooling plant. Two (2) new packaged chillers are to be installed on a new pad, within a new acoustic enclosure outside. Tree relocation (if required), trenching and site grading to be completed to suit new chiller installation. New buried pipework into the facility, new piping within the facility, three (3) new primary chilled glycol pumps, glycol and all related piping, equipment and controls are to be provided. Complete pre- and post-construction balancing reports are to be completed. Due to long equipment lead time, the chillers have been pre-ordered by Queen's. Boilers - Two (2) existing boilers installed in the mechanical room are to be removed. New Viessmann Vitodens cascade system complete with four boilers and circulation pumps, low-loss header, manifold and associated controls and accessories is to be provided. Two (2) new primary heating pumps to be provided complete with piping, accessories and controls. Existing venting through roof is to be removed and roof openings repaired. New venting through roof to be provided for new boiler plant. New gas and condensate piping and accessories to be provided. Existing janitor's sink to be relocated. Housekeeping pad modifications to be completed to suit new equipment. Complete pre- and post-construction balancing reports are to be completed. Process Cooling - The existing process chiller, installed in the mechanical room is to be removed. Existing process chiller condensing unit installed on roof is to be removed. Associated accessories, controls, piping and refrigerant are to be removed. Two (2) new process chilled water pumps, chilled water heat exchanger, backup domestic cold water heat exchanger and associated piping, accessories and controls are to be provided. One (1) new stainless steel de-ionized water pump is to be provided complete with accessories and controls. Housekeeping pad modifications to be completed to suit new equipment. Pre- and post-construction balancing reports are to be completed for process cooling system. Humidifier - The existing gas-fired humidifier and associated manifold, piping, accessories and controls, installed in the mechanical room, is to be removed. Existing venting through wall is to be removed and wall repaired. Two (2) new electric humidifiers are to be provided complete with new manifold in existing air handling unit, new piping, accessories, and controls. BAS - Enlist service of site controls company to update per mechanical drawings and specifications. SF6 Gas Detection - Four (4) existing SF6 sensors and associated extraction tubing are to be removed. New Honeywell Midas SF6 sensors are to be provided and integrated into the existing Honeywell SF6 controls. Existing ductwork, controls and BAS programming to be modified to allow for decreased response time. Complete pre- and post-construction air balancing reports are to be completed in both normal and 'purge' operation. ATS - Existing automatic transfer switch is to be removed and replaced with new ATS with bypass. Deadline for Questions: Friday, July 29, 2022 before 4:00pm

Award

Laboratories

$1,272,868.00

Public - State/Provincial

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
32
Bidding Soon
437
All Active Projects
193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

August 18, 2022

img_map_placeholder

136 Grant Timmins Dr, Kingston, ON


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.