BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Concord, North Carolina. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project completes the McEachern Greenway to the Hospital. P&R has contracted with TELICS to assist with the acquisition of nine (9) of the fifteen (15) critical parcels needed to make the greenway connection. The City is working on an additional four (4) parcels including the Concord High School parcel, which includes a parcel needed for the connection to the Branchview side of Three Mile Branch. TELICS will analyze fee simple vs. easement/donation for everything between the creek and the road. The design for this greenway will be completed internally by Engineering for cost savings. Phase I: The construction of a pedestrian bridge to access the Branchview side of Three Mile Branch. Additionally, the design and construction of approximately .80 miles of greenway at $2.0 million per mile for the greenway alignment from where the current greenway ends behind the Shell Station to Miramar. Culvert replacement estimates Brookwood for FY24 & Miramar in FY28. Phase II: This will include the design and construction of the greenway from Miramar to David Phillips Activity Center (DPAC), approximately 1.2 miles at $2.0 million per mile. It will also include the design and construction of a trail head parking lot. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of July 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$4,480,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
40
Bidding Soon
1,073
All Active Projects
445
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

Multiple Locations, Concord, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.