BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work, paving and new construction of a mixed-use development in Concord, North Carolina. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project completes the McEachern Greenway in two phases by connecting to Lake Concord at Atrium Health. The City of Concord has site control from existing greenway to Miramar. P&R has contracted with TELICS to assist with the acquisition of the nine (9) parcels needed to make the greenway connection for Phase II. The design for this greenway will be completed internally by Engineering for cost savings. Phase I: A pedestrian bridge will be constructed to access the Branchview side of Three Mile Branch. Additionally, the design and construction of approximately 1 mile of greenway at $3.7 million per mile will cover the cost for the greenway alignment and the cost of a pedestrian steel bridge for a pedestrian crossing. The location is near where the current greenway ends behind the Shell Station to Miramar with an at grade crossing at Brookwood. This project timeline aligns with a Stormwater project to place the Miramar culvert. The culvert replacement will be critical for pedestrian access and connectivity to Beverly Hills Park. These two projects are currently planned for FY27. Phase II: This will include the design and construction of the greenway from Miramar to David Phillips Activity Center (DPAC) through the nearby neighborhood with a cost of approximately 1 mile at $1.7 million per mile. Phase III: The connectivity to the Senior Center with a culvert when NCDOT widens Highway 3. Then the connection from DPAC to Hospital on Lake Concord. The project is included in the City's 2025 - 2030 Capital Improvement Program (CIP). As of November 13, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$3,700,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
123
Bidding Soon
1,562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Concord, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.