Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Site work, paving and new construction of a mixed-use development in Concord, North Carolina. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
This project completes the McEachern Greenway in two phases by connecting to Lake Concord at Atrium Health. The City of Concord has site control from existing greenway to Miramar. P&R has contracted with TELICS to assist with the acquisition of the nine (9) parcels needed to make the greenway connection for Phase II. The design for this greenway will be completed internally by Engineering for cost savings. Phase I: A pedestrian bridge will be constructed to access the Branchview side of Three Mile Branch. Additionally, the design and construction of approximately 1 mile of greenway at $3.7 million per mile will cover the cost for the greenway alignment and the cost of a pedestrian steel bridge for a pedestrian crossing. The location is near where the current greenway ends behind the Shell Station to Miramar with an at grade crossing at Brookwood. This project timeline aligns with a Stormwater project to place the Miramar culvert. The culvert replacement will be critical for pedestrian access and connectivity to Beverly Hills Park. These two projects are currently planned for FY27. Phase II: This will include the design and construction of the greenway from Miramar to David Phillips Activity Center (DPAC) through the nearby neighborhood with a cost of approximately 1 mile at $1.7 million per mile. Phase III: The connectivity to the Senior Center with a culvert when NCDOT widens Highway 3. Then the connection from DPAC to Hospital on Lake Concord. The project is included in the City's 2025 - 2030 Capital Improvement Program (CIP). As of November 13, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$3,700,000.00
Public - City
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Multiple Locations, Concord, NC
Related To This Project
Concord, NC
--
Concord, NC
Bid Date: Jan 15 2026
Concord, NC
--
Concord, NC
--
Concord, NC
--
Concord, NC
Bid Date: Jul 06 2022
Concord, NC
--
Concord, NC
Bid Date: Jun 01 2022
Concord, NC
Bid Date: Jun 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.