BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Keller, Texas. Working plans call for the renovation of a educational facility.

The owner has determined a prequalified list of general contractors. Mission Restaurant Supply , Strategic Equipment LLC , Douglas Equipment Question Cuttoff Date & Time 7/20/2022 03:00:00 PM (ET) This is a Request for Proposal for combi oven replacements at 19 Keller ISD campus cafeterias. This RFP replaces RFP #2206-24 which was not awarded. Please note that some terms and conditions have changed, and it is expected and required that all vendors understand and respond to all new RFP requirements. The term of this contract shall be from the date of award until June 30, 2023.

Final Planning

Educational

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
197
Bidding Soon
3,967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2022

August 29, 2022

Project location map

Multiple Locations, Keller, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.