BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2022 at 8:00 PM

Updated October 25, 2023

Site work and paving for a sidewalk / parking lot in Keller, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project No. 1314-19-14 Lot H scope includes approximately 800 SY milling, 8,600 SY of 11 inch depth pulverization, removal of 4 inches, mix top seven inches with 6% cement, spread, shape and compact, cure 48 hours then microcrack. Install 4 inches Type D Surface Course (2 lifts at 2 inches each). Install approximately 1,400 SY Tensar GP 25 between lifts over 30 inch waterline and various other tasks. Keller Youth Association (KYA) Lot scope includes approximately 50 SY milling, 4,150 SY of 11 inch depth pulverization, removal of 4 inches, mix top seven inches with 6% cement, spread, shape and compact, cure 48 hours then microcrack. Install 4 inches Type D Surface Course (2 lifts at 2 inches each). Install approximately 400 LF flush curb as add alternate and various other tasks.

Award

Sidewalks / Parking Lot

$729,119.00

Public - City

Paving, Site Work

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
131
Bidding Soon
3,900
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2022

September 15, 2022

Project location map

265 Golden Triangle Boulevard, Keller, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.