BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 26, 2022 at 8:00 PM

Updated January 25, 2024

Renovation of a fire / police facility in Wallingford, Connecticut. Completed plans call for the renovation of a fire / police facility.

Roof Replacement - Fire Department - Station 1 Be for a complete and professional Installation Include all necessary materials, equipment, labor, and supervisor, Include removal and disposal of existing roofing system, Contractor must be certified by manufacturer to be an installer of the product proposed and for the type of installation, Contractor must be licensed and insured to perform such work in the State of Connecticut, Three (3) references for work similar in size and scope must be provided, Apply for and provide permit, Upon arrival setup all safety related requirements and provide dumpsters for debris, Perform repairs to cupola and paint, At base of cupola, furnish and install brush grade silicone and reinforced fabric to flash seams, Furnish and install a new silicone-based coating system to completely encapsulate and create a weather tight condition Remove entire shingle roof system down to original substrate Replace any roof decking where needed.Over a clean and repaired roof deck, furnish and install new ice and water shield over entire roof area, Furnish and install a new lifetime architectural roofing system complete with all flashings and terminations required, Repair or replace gutters as required, On flat roof system, remove all roofing down to original roof deck, Replace any roof decking where needed, Furnish and install new perimeter wood blocking, Furnish and install two new layers of 2.6" insulation to meet state code, Furnish and install a new .060mil. fully adhered EPDM roofing system complete with all flashings and terminations required, Furnish and install new .040 aluminum copings, Provide owner with a minimum twenty-year manufacturer's warranty Requests for clarification are due Tuesday, August 9, 2022 5:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)].

Award

Fire / Police

$51,444.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,114
Active Projects
423
Bidding Soon
7,848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2022

September 19, 2022

Project location map

95 N Main St, Wallingford, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.