BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and outdoor lighting for a road / highway in Carlsbad, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Submission of the electronic bid into the system may not be instantaneous. Due to the speed and capabilities of the users internet service provider (ISP), bandwidth, computer hardware and other variables, it may take time for the bidders submission to upload and be received by the Citys Bidding system. It is the bidders sole responsibility to ensure their bids are received on time by the Citys Bidding system. The City of Carlsbad is not responsible for bids that do not arrive by the Due Date and Time. The City of Carlsbad reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids Except as provided herein a bid submitted to the City by a Contractor who is not licensed as acontractor pursuant to the Business and Professions Code shall be considered nonresponsive and shall be rejected by the City. In all contracts where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with Californialaw. Where federal funds are involved the contractor shall be properly licensed at the time the contract is awarded. In all other cases the contractor shall state their license number, expirationdate and classification in the proposal, under penalty of perjury. This invitation to bid does notinvolve federal funds. The following classifications are acceptable for this contract: C-10, General Electrical. Pursuant to the California Labor Code, the director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with California Labor Code, section 1773 and a copy of a schedule of said general prevailing wage rates is on file in the office of the City Engineer and is incorporated by reference herein. Pursuant to California Labor Code, section 1775, Contractor shall pay prevailing wages. Contractor shall post copies of all applicable prevailing wages on the job site. Contractor shall comply with California Labor Code, section 1776, which generally requires keeping accurate payroll records, verifying and certifying payroll records, and making them available for inspection. Contractor shall require all subcontractors to comply with Section 1776.

Award

Roads / Highways

$767,012.00

Public - City

Outdoor Lighting, Site Work

5

7

11

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
101
Bidding Soon
2,284
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

July 28, 2023

img_map_placeholder

Multiple Locations, Carlsbad, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.