BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a clubhouse / community center in Perryville, Missouri. Completed plans call for the renovation of a clubhouse / community center.

The City of Perryville reserves the right to reject any or all bids. If you have any questions, please contact Parks & Recreation Director Jim Cadwell or Keith Riney at the Perry Park Center at 573-547-7275. Scope of Project: o Chosen contractor shall supply all materials and labor necessary for painting the interior walls of the Perry Park Center. A site visit is required to bid on this project. o The Perry Park Center will not be closed during this project. o Advance notice is required for areas that will need to be closed off for painting. o This project will be done in phases, only Phase 1 will be completed at this time. o Phase 1 painting area is listed below. Phase 1 area that requires painting: o Perry Park Center main entry area both sides of hallway from top to bottom o Theatre hallway from top to bottom o Meeting room from top to bottom o All steel doors are to be painted o All door frames are to be painted o All cove base is to be removed o Center stairway circle area paint from top to bottom o Center stairwell paint handrails and beam all the way to bottom floor o Main hallway that houses the concession stand paint from top to bottom o North and east stairwells paint walls on both floors and top to bottom including handrails Phase 1 areas that do not require paint: o Do not paint library o Do not paint inside any restroom o Do not paint pool hallway o Do not paint any of the concession stand walls located just outside of concession stand o Do not paint the concession stand hallway ceiling just outside concession stand itself. o Do not paint the green steel beams located in main hallway center circle ceiling area.

Award

Clubhouse / Community Centers

$33,140.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
44
Bidding Soon
753
All Active Projects
290
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

September 9, 2022

img_map_placeholder

800 City Park Ln, Perryville, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.