Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in New London, Connecticut. Contact the soliciting agency for additional information.
The Contractor shall provide all equipment, labor, materials, supervision and transportation for snow removal service for Cadet Memorial Field at US Coast Guard Academy, 15 Mohegan Ave. New London CT. All work must be done IAW the attached Performance Work Statement (PWS) and Tech. Exhibit. The Request for Quote (RFQ) is for Base Plus Four (04) Option Years as per CLIN 001 through 007 of the addendum attached. Site visit is highly recommended: Any bidder interested in completing the project shall perform a site visit to the locations of the project to become familiar with all the existing conditions under which the project will be performed prior to submitting their bid. The POC for site visit is Jason Askew, tel no. (860) 444-8552 (o) or you can email him at Jason.M.Askew@uscg.mil. He is also the POC if you have any questions on PWS. Preference 19.502-2 Total small business set-asides. If no acceptable offers from responsible small business concerns are received, the set-aside shall be withdrawn and all acceptable offers will be accepted. 1.0 GENERAL 1.1 Background The United States Coast Guard (USCG) Academy is an educational institution, which educates, trains and develops leaders of character who are ethically, intellectually, professionally and physically prepared to serve their country and humanity. The Academy provides a four-year Bachelor of Science program to a corps size of approximately 1,000 cadets. The Contractor shall furnish all labor, equipment, transportation and supervision to provide snow removal for Cadet Memorial Field. 1.2 Scope Snow removal services shall be performed in the following areas: a. Cadet Memorial Field (synthetic turf field) 84,254 sq ft 1.3 OBJECTIVE The objective is to provide a playable field during periods of inclement winter weather. 1.4 APPLICABLE REFERENCE DOCUMENTS 1.5 PERFORMANCE REQUIREMENTS SUMMARY This contract includes a Performance Requirements Summary (PRS) at PWS 9.0. The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the Contracting Officers Representative (COR). Evaluation of the Contractors overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified without prior written approval of the Contracting Officer. 2.0 SPECIFIC REQUIREMENTS/TASKS 2.1 GENERAL REQUIREMENTS 2.1.1 Response Time. a. Cadet Memorial Field. For snow events covered under Task 001, the Contractor shall respond to mobilization calls and commence plowing operations within one hour of receiving the notification from the COR. 2.1.6 Requirements Portion. The services covered in paragraphs 2.2 of this Performance Work Statement will be ordered from the Contractor on an as needed basis and will be activated with the issuance of a contract modification or Task Order(s). The Contractor shall only be paid for services rendered and accepted by the government. 2.2 TASK ONE - Snow and/or Ice Clearing Mobilization for Cadet Memorial Field. Upon notification from the COR, the Contractor shall commence snow and/or ice clearing operations. A single snow and/or ice clearing mobilization consists of ALL work required to mobilize with necessary equipment; continually clear the field surface after precipitation has stopped. Period of Performance The period of performance for this contract is a one-year base period with four one-year option periods as follows: Base Period September 15, 2022 through September 14, 2023 Option Period One September 15, 2023 through September 14, 2024 Option Period Two September 15, 2024 through September 14, 2025 Option Period Three September 15, 2025 through September 14, 2026 Option Period Four September 15, 2026 through September 14, 2027 4.2 PLACE OF PERFORMANCE The primary place of performance will be the United States Coast Guard Academy, 15 Mohegan Avenue Parkway, New London, Connecticut 06320. 4.3 HOURS OF OPERATION Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this PWS.The Contractor shall provide all equipment, labor, materials, supervision and transportation for snow removal service for Cadet Memorial Field at US Coast Guard Academy, 15 Mohegan Ave. New London CT. All work must be done IAW the attached Performance Work Statement (PWS) and Tech. Exhibit. The Request for Quote (RFQ) is for Base Plus Four (04) Option Years as per CLIN 001 through 007 of the addendum attached. Site visit is highly recommended: Any bidder interested in completing the project shall perform a site visit to the locations of the project to become familiar with all the existing conditions under which the project will be performed prior to submitting their bid. The POC for site visit is Jason Askew, tel no. (860) 444-8552 (o) or you can email him at Jason.M.Askew@uscg.mil. He is also the POC if you have any questions on PWS. Preference 19.502-2 Total small business set-asides. If no acceptable offers from responsible small business concerns are received, the set-aside shall be withdrawn and all acceptable offers will be accepted. 1.0 GENERAL 1.1 Background The United States Coast Guard (USCG) Academy is an educational institution, which educates, trains and develops leaders of character who are ethically, intellectually, professionally and physically prepared to serve their country and humanity. The Academy provides a four-year Bachelor of Science program to a corps size of approximately 1,000 cadets. The Contractor shall furnish all labor, equipment, transportation and supervision to provide snow removal for Cadet Memorial Field. 1.2 Scope Snow removal services shall be performed in the following areas: a. Cadet Memorial Field (synthetic turf field) 84,254 sq ft 1.3 OBJECTIVE The objective is to provide a playable field during periods of inclement winter weather. 1.4 APPLICABLE REFERENCE DOCUMENTS 1.5 PERFORMANCE REQUIREMENTS SUMMARY This contract includes a Performance Requirements Summary (PRS) at PWS 9.0. The PRS plays an integral role in the administration of the contract. In addition to any applicable inspection clauses or other related terms and conditions contained in the contract, the PRS shall serve as a primary tool for inspection and acceptance of services as facilitated by the Representative (COR). Evaluation of the Contractor's overall performance shall be in accordance with the performance standards set forth in the PRS, and will be conducted by the COR. The PRS constitutes a material aspect of the contract and will not be changed or otherwise modified . 2.0 SPECIFIC REQUIREMENTS/TASKS 2.1 GENERAL REQUIREMENTS 2.1.1 Response Time. a. Cadet Memorial Field. For snow events covered under Task 001, the Contractor shall respond to mobilization calls and commence plowing operations within one hour of receiving the notification from the COR. 2.1.6 Requirements Portion. The services covered in paragraphs 2.2 of this Performance Work Statement will be ordered from the Contractor on an "as needed basis" and will be activated with the issuance of a contract modification or Task Order(s). The Contractor shall only be paid for services rendered and accepted by the government. 2.2 TASK ONE - Snow and/or Ice Clearing Mobilization for Cadet Memorial Field. Upon notification from the COR, the Contractor shall commence snow and/or ice clearing operations. A single snow and/or ice clearing mobilization consists of ALL work required to mobilize with necessary equipment; continually clear the field surface after precipitation has stopped. Period of Performance The period of performance for this contract is a one-year base period with four one-year option periods as follows: Base Period September 15, 2022 through September 14, 2023 Option Period One September 15, 2023 through September 14, 2024 Option Period Two September 15, 2024 through September 14, 2025 Option Period Three September 15, 2025 through September 14, 2026 Option Period Four September 15, 2026 through September 14, 2027 4.2 PLACE OF PERFORMANCE The primary place of performance will be the United States Coast Guard Academy, 15 Mohegan Avenue Parkway, New London, Connecticut 06320. 4.3 HOURS OF OPERATION Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this PWS.
Post-Bid
Military
Public - Federal
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2022
October 10, 2022
15 Mohegan Ave Pkwy, New London, CT
Related To This Project
New London, CT
Bid Date: Aug 30 2022
New London, CT
Bid Date: Aug 23 2022
New London, CT
Bid Date: Apr 09 2020
New London, CT
Bid Date: Sep 28 2022
New London, CT
--
New London, CT
Bid Date: Sep 26 2022
New London, CT
Bid Date: Apr 05 2022
New London, CT
--
New London, CT
Bid Date: Jul 13 2022
New London, CT
Bid Date: Aug 19 2022
New London, CT
Bid Date: Jun 21 2022
New London, CT
Bid Date: Jul 14 2022
New London, CT
Bid Date: Aug 04 2022
New London, CT
Bid Date: Jul 21 2022
New London, CT
Bid Date: Jun 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.