EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 13, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Lake Forest, Illinois. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

In general, the project work consists of the following prime contract: a.Playground and Drainage Improvements at Sheridan Elementary School. b.Refer to Section 01 10 00 - Summary for a description of the work included in the project. c. Project includes Allowances; see Section 01 21 00 Allowances for more information. Type of Contract: Single Lump Sum Contract, AIA Document A105. Bid Form: Bids must be submitted on forms provided by the Architect. Documents will be delivered electronically in PDF format. The contractor shall be required to comply with all provisions of the acts of the General Assembly of the State of Illinois related to Wage Rates, Discrimination, Sexual Harassment, Alcohol Use and Preference to Illinois Workmen. 8. Additional information and bidder requirements are included in the Instructions to Bidders and the Bid Documents. 9. Bid Stipulations: a.The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond for the full amount of the bid accepted. b.The Owner reserves the right to accept or reject any or all bids to waive any informalities in any bidding. c. No proposals shall be withdrawn for a period of sixty (60) days after the submittal of proposals. d.Bid Security is required in the amount of ten (10) percent of Proposal, made payable unconditionally to the Owner. Security shall be either certified check, cashier's check or bid bond issued by surety licensed to conduct business in the State of Illinois. 11.Last day for Addendums shall be 5:00 PM on Wednesday, October 26, 2022. 12.Last day for contractor questions shall be 5:00 PM on Monday, October 24, 2022. John Jewell, Project Architect Perkins + Will The Wrigley Building 410 N. Michigan Avenue Suite 1600 Chicago, IL 60611

Bid Results

Playgrounds / Parks / Athletic Fields

$148,050.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Painting and Coating
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
131
Bidding Soon
2,638
All Active Projects
1,110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

November 28, 2022

img_map_placeholder

1360 N Sheridan Rd, Lake Forest, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Sheridan Elementary School Playground Work 2022

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.