BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Austin, Texas. Completed plans call for the renovation of a educational facility.

As of September 21, 2022, the project has been awarded. A contract award amount and a timeline for construction have not been confirmed. Del Valle ISD is requesting proposals to conduct various turn-key L.E.D. lighting upgrades in select campuses throughout the district. The campuses are Baty ES, Creedmoor ES, Dailey MS, Del Valle ES, Gilbert ES, Hillcrest ES, Ojeda MS and Popham ES. Responses must be submitted digitally through the online portal. The Del Valle ISD Board of Trustees reserves the right to reject any and/or all responses and waive all formalities in the RFP process Del Valle ISD commissioned this assessment report to evaluate the condition of the existing lighting systems in cafeterias, gyms, libraries, exterior building mounted and exterior area/parking lots to evaluate the potential for replacement of fluorescent/HID lighting to more efficient LED lighting. This report includes suggested LED light fixture replacements in tabular form (Appendix C) from a single vendor that have a similar appearance and lumen output as the existing non-LED fixtures that could be considered for a direct one-for-one replacement. This listing of suggested LED fixtures includes the fixture series type, lumen output and other options related to appearance and light distribution; further description of additional options required for fixture mounting are not included. If Del Valle intends to use this report to commission fixture replacement, the successful contractor will need to visit the site and determine the means, methods, and light fixture mounting options required for a complete and working replacement. The following campuses are included in this report: a. Baty Elementary School b. Creedmoor Elementary School c. Dailey Middle School d. Del Valle Elementary School e. Del Valle Opportunity Center f. Gilbert Elementary School g. Hillcrest Elementary School h. Ojeda Middle School i. Popham Elementary School Project Goals: 5.1 Goal 1: Remove and replace existing conventional lighting fixtures, both interiorand exterior, with approved L.E.D. substitutes. 5.2 Goal 2: Reduce O&M cost, extend fixture life and provide enhanced lighting for |students and staff. Scope of Work: The selected contractor will: o Conduct a site review and assessment of each of the specified campuses and confirm quantity, location and fixture type with DVISD, using the supplied document. o Removal and disposal of existing fixtures, including proper disposal of any PCB ballasts and/or mercury containing fixtures. o L.E.D. replacement using approved or alternate fixtures. o Each campus would need to be completed before starting another, unless multiple crews work simultaneously. o Campus access would be controlled by DVISD and adhere to existingoperating schedules. o Contractor will provide a timeline for project completion for each campus. o Any parking lot lighting replacement will need to be conducted after school hours and on weekends to reduce possible traffic congestion during student drop-off and pick-up times. o A final walk-thru will be scheduled by the contractor with DVISD Project Managers prior to submitting final pay-application. Del Valle Independent School District Department of Maintenance & Facilities 2454 Cardinal Loop, Del Valle, Texas, 78617 o Interior campus access will be: o Elementary Schools - 4:00 pm to 4:00 am (or all day Saturday/Sunday) o Middle Schools - 6:00 pm to 6:00 am (or all day Saturday/Sunday) Contract Begins: on or after September 21, 2022 Substantial/Final Completion: Complete with all LED service-related replacements on or before August 1, 2023 Estimated Budget: $750,000.00 Questions Due Date: Aug 31st 2022, 3:00 PM CDT

Award

Educational

$750,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
143
Bidding Soon
3,642
All Active Projects
1,450
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.