BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Patrick, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 18, 2022, the project has been awarded. A timeline for construction has not been confirmed. This project consists of seismic retrofit and rehabilitation of multiple structures along I-80 in Washoe and Lyon County, between mileposts WA 43.80 to 45.09 and LY 0.00 to 3.70. The road is classified as an Interstate, has two lanes of traffic in each direction, and a posted speed limit of 70 mph. Traffic control will consist of single lane closures utilizing flaggers, ramp closures, and crossovers to facilitate two-lane, two-way traffic on one side of a divided facility. This Transportation Management Plan (TMP) will describe the transportation management strategies developed throughout the course of this project. The strategies developed include the Maintenance of Traffic Plan and the Transportation Operations Plan. DBE participation goal of 6.5% Type: District-2 Contract Cost Range: R30 ($11,500,000.01 to $13,500,000) Funding Type: FEDERAL County(s): Carson city Enterprise Goal: 6.5 % Location: I-80, near Wadsworth and Fernley seismic retrofit and rehabilitation of I-700 East and West, I-717 East and West, I-740 East and West, and H-844 East and West Prequalification Required: Y Route(s): IR080-1 Milepost(s): MP WA 43.80 to MP LY 3.70 Contract Days: 220 (working) Liquidated Damages: $5,900.00 Project Length: 5.0000 mi Stations: PE 26+92.05 P.O.C. - PE 286+59.73 P.O.C. NVDOT - Seismic Retrofit and Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$16,900,000.00

Public - State/Provincial

Paving, Site Work

107

16

13

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
13
Bidding Soon
232
All Active Projects
95
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

October 24, 2022

img_map_placeholder

Interstate 80, Patrick, NV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.