Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Patrick, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of November 18, 2022, the project has been awarded. A timeline for construction has not been confirmed. This project consists of seismic retrofit and rehabilitation of multiple structures along I-80 in Washoe and Lyon County, between mileposts WA 43.80 to 45.09 and LY 0.00 to 3.70. The road is classified as an Interstate, has two lanes of traffic in each direction, and a posted speed limit of 70 mph. Traffic control will consist of single lane closures utilizing flaggers, ramp closures, and crossovers to facilitate two-lane, two-way traffic on one side of a divided facility. This Transportation Management Plan (TMP) will describe the transportation management strategies developed throughout the course of this project. The strategies developed include the Maintenance of Traffic Plan and the Transportation Operations Plan. DBE participation goal of 6.5% Type: District-2 Contract Cost Range: R30 ($11,500,000.01 to $13,500,000) Funding Type: FEDERAL County(s): Carson city Enterprise Goal: 6.5 % Location: I-80, near Wadsworth and Fernley seismic retrofit and rehabilitation of I-700 East and West, I-717 East and West, I-740 East and West, and H-844 East and West Prequalification Required: Y Route(s): IR080-1 Milepost(s): MP WA 43.80 to MP LY 3.70 Contract Days: 220 (working) Liquidated Damages: $5,900.00 Project Length: 5.0000 mi Stations: PE 26+92.05 P.O.C. - PE 286+59.73 P.O.C. NVDOT - Seismic Retrofit and Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Award
Roads / Highways
$16,900,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2022
October 24, 2022
Interstate 80, Patrick, NV
Related To This Project
Patrick, NV
--
Patrick, NV
Bid Date: Oct 27 2022
Elko, NV
Bid Date: Sep 01 2022
Eureka, NV
Bid Date: Sep 08 2022
Fallon, NV
Bid Date: Sep 22 2022
Elko, NV
Bid Date: Sep 22 2022
Las Vegas, NV
Bid Date: Jan 23 2023
Las Vegas, NV
Bid Date: Jan 09 2023
Las Vegas, NV
Bid Date: Jan 25 2023
Las Vegas, NV
Bid Date: Jan 09 2023
Las Vegas, NV
Bid Date: Jan 26 2023
Reno, NV
Bid Date: Jan 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.