BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Lees Summit, Missouri. Completed plans call for site work for a water / sewer project.

The Work for the project, Stormwater - SE Hackamore Drive includes, but is not necessarily limited to: Removing and replacing the existing 66 inch CMP stormwater collection system with a 72 inch RCP collection system. The work includes junction boxes, area inlets, CIPP lining of a 15" CMP, and Redi-Rock retaining walls. The work also includes the relocation of an existing water line, services, fire hydrant, and other incidentals.

Award

Water / Sewer

$843,699.00

Public - City

Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
107
Bidding Soon
1,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

September 30, 2022

Project location map

SE Hackamore Dr, Lees Summit, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.