Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 20, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Monona, Wisconsin. Completed plans call for site work for a water / sewer project.
The work for which bids are asked includes the following: Sanitary sewer lining project for six (6) sites with approximately 5,498 total linear feet of 8-inch resin impregnated cured-in-place (CIPP) mainline lining; reinstate 95 lateral connections; traffic control; flow management / bypass pumping; and an alternate bid for an undistributed 100 linear feet of heavy cleaning, debris and root removal. The anticipated substantial completion date is June 23, 2023 and final completion date is June 30, 2023. Additional Description: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids.
Award
Water / Sewer
$136,270.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 04 - Masonry
Division 10 - Specialties
Division 11 - Equipment
Division 14 - Conveying Equipment
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2022
September 26, 2022

Multiple Locations, Monona, WI
Related To This Project
Monona, WI
--
Monona, WI
Bid Date: Feb 17 2022
Monona, WI
Bid Date: Feb 18 2021
Monona, WI
Bid Date: Apr 22 2021
Monona, WI
Bid Date: Jun 30 2022
Monona, WI
--
Monona, WI
Bid Date: Apr 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.