BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Port Arthur, Texas. Contact the soliciting agency for additional information.

Questions concerning the Invitation to Bid or Scope of Work should be directed in writing to: City of Port Arthur, TX Clifton Williams, Purchasing Manager P.O. Box 1089 Port Arthur, TX 77641 clifton.williams@portarthurtx.gov This is a one (1) year contract with option to renew for one additional year Contractor must perform the following services for all generators. 1) Lubrication System a) Check oil level b) Inspect engine seals for leaks c) Inspect lube oil for obvious contamination d) General overview visual check e) Document and log all findings 2) Fuel/Exhaust System a) Inspect air filters b) Inspect intake system c) Inspect exhaust system d) Inspect fuel tanks e) Check gas and fuel levels f) Inspect carburetors, regulators, and linkages g) General overview visual check h) Document and log all findings 3) Battery a) Check charger and gauges b) Inspect racks, mountings, and casings c) Inspect cabling condition d) Inspect connections and clean e) Check electrolyte levels and fill f) Load test g) General overview visual check h) Document and log all findings 4) Coolant System a) Check coolant level and top off b) Test coolant protection levels c) Inspect hoses d) Inspect for leaks e) Inspect radiator cap f) General overview visual check g) Document and log all findings 5) Engine General a) Inspect belts and tension b) Inspect and lubricate all governor linkage c) Adjust governor linkage (as needed) d) Test starter operation e) Check engine block heater operation f) Check of all gauges and meters g) Inspect crankcase breather and clean (as needed) h) General overview visual check i) Document and log all findings 6) Generator a) Check unit voltage and adjust b) Check frequency of output voltage and adjust c) Inspect all cabling connections d) Check for any bearing, grinding, or arcing e) Foreign debris check f) Test no load operation g) Test operation with building load (once a year) h) Check control panel operation i) General overview visual check j) Document and log hour meter/run time k) Tightened all electrical connections 7) Transfer Switch a) Check of all gauges and meters b) Test all alarms and auto shutdowns c) Inspect all safety switches d) Check the exerciser clock operation e) Check wiring and connectors f) Check relays and controls g) Transfer Test (bi-annual) h) General overview visual check i) Document and log all findings j) Tightened all electrical connections 8) General a) Inspect condition of all mountings b) Inspect/Check safety shutdown devises c) Inspect/Adjust locks, latches, and weather seals d) Check fans dampers and louvers e) General overview visual check f) Document and log all findings

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
20
Bidding Soon
501
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2022

September 23, 2022

img_map_placeholder

Multiple Locations, Port Arthur, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.