Published September 24, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a municipal facility in Windom, Minnesota. Completed plans call for site work for a municipal facility.

The general nature of the work on which bids will be received consists of the construction of approximately 3.93 miles of 69 kV transmission line. Included is furnishing and installing structures, insulators, conductor, and associated hardware. The Work will be substantially completed on or before August 30, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before September 29, 2023. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $500 for each day that expires after such time until the Work is completed and ready for final payment. All bids shall be made on proposal forms furnished by the Engineer and shall be accompanied by bid security in the form of a certified check or bid bond, made payable to City of Windom, in the amount of ten percent (10%) of the bid, which security becomes the property of the City of Windom in the event the successful bidder fails to enter into a contract and post satisfactory performance and payment bonds

Bid Results

Municipal

$2,999,408.00

Public - City

Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
35
Bidding Soon
365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

November 7, 2022

Project location map

Multiple Locations, Windom, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.