BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Schaumburg, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.forestparkreview.com/2022/08/30/state-capital-plan-funds-ike-projects-major-corridor-fixes/ State capital plan funds Ike projects, major corridor fixes The latest Illinois Department of Transportation capital improvement program for fiscal years 2023 to 2028 includes funding for a number of west suburban projects - including something that may allow buses to ride past rush-hour traffic from Forest Park to as far north as Palatine. The highway portion of the plan includes around $11.74 million to rebuild the shoulders of I-290 and Route 53 between Desplaines Avenue and Lake Cook Road in northwest suburban Palatine. The improvement will allow buses to ride on the shoulder during rush hour and other slow traffic conditions, something that Pace buses already do on I-55 and I-94 expressways. The plan also includes funding for various bridge replacement projects, sidewalk accessibility improvements and traffic signal improvements, many in Forest Park, Oak Park and River Forest. But it may be a while before riders see Pace buses serve the entire corridor. Pace spokesperson Maggie Daly Skogsbakken said the transit agency is currently in the early stages of doing the market analysis for the section of I-290 between the Forest Park CTA terminal and Mannheim Road. The specifics of that service, as well as any use of the shoulder further northwest, won't be decided until later time. According to IDOT spokesperson Guy Tridgel, "the general scope of work consists of restriping, resurfacing, signage and rumble strip modifications." "The project will accommodate both existing Pace service and routes planned in the future," he added. Pace Route 757, a rush-hour commuter shuttle, which linked the Harlem/Lake CTA Green Line station in Oak Park, the Forest Park Blue Line terminal and office parks and hotels in the northwest suburbs, used I-290, but that service has been suspended since early in the pandemic. Pace route 604 uses most of the Route 53 portion of the corridor. Daly Skogsbakken said Pace couldn't comment on the future of the suspended routes, including Route 757, until the budget 2023 budget process begins this fall. However, she said that Pace's experience with similar services suggests that riders will flock to express routes that are competitive with driving time. She said Pace asks IDOT for bus-on-shoulder improvements for potential future service. For now, their first priority is the Desplaines to Mannheim portion, since IDOT already indicated that it was planning to refurbish that stretch. Since their ridership data was pre-pandemic, Pace wanted to make sure that any service they launch fits the current commuting patterns, where employees don't go to the office as much as they used to. Daly Skogsbakken said that the study is currently" in the early stages," and the rest of the timeline will depend on when IDOT makes the improvements and the results of the market study. As for the rest of the corridor, Daly Skogsbakken said Pace is preparing to do a "full system analysis and really look at the high-level view" of how the pandemic affected ridership demand region wide. The highway portion of the program also includes funding for a number of west suburban projects. Around $28.4 million has been earmarked to replace Ridgeland Avenue bridge over I-290, replacing the retaining walls and signals for the railroad tracks below. Around $5 million will go toward repaving Roosevelt Road from Desplaines Avenue to the Belt Railway embankment in Chicago's Austin neighborhood, with the plan stating that the work will take place in 2023. Another $585,000 will go toward accessibility improvements for the section of Desplaines Avenue between Madison Street and Roosevelt Road scheduled for 2023. A total of $8.06 million is earmarked for replacing the I-290 bridge over Des Plaines River. A total of around $3.19 million will go toward signal improvements and repaving the section of Harlem Avenue between Armitage and North avenues, with $9 million going toward repaving and accessibility improvements for North Avenue between I-294 and Harlem Avenue. Another $900,000 will go toward construction engineering for improvements for North Avenue between Cicero Avenue and York Road in Elmhurst. In a statement to the media, Illinois Transportation Secretary Omer Osman touted the plan as "perhaps the most consequential in the history of IDOT" due to increased state and federal investment. "We look forward to working with our partners and stakeholders, delivering these important projects in communities up and down our state," he said. _____________________________ Job No. V-91-021-22, Phase II Engineering Project, FAI 290 (Eisenhower Expressway) at Ridgeland Avenue and Western Avenue, Cook County, Region One/District One. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 9:00 AM at the Region One, District One Office in Schaumburg. Phase II engineering services are required for the replacement of the bridge structure carrying Ridgeland Avenue over I-290 and superstructure replacement of the bridge structure carrying Western Avenue over I-290. The existing structure numbers are S.N. 016-0710 and S.N. 016- 2083, respectively. The Consultant's work is expected to consist of preparing the type, size, and location (TS&L) and structure plans of both bridge structures as described above. The proposed improvement also consists of preparing plans, specifications and estimates to current standards and policies for the reconstruction of Ridgeland Avenue and Western Avenue. There might be proposed retaining walls on the north side of the proposed job limits of Ridgeland Avenue. Other work may include topographic survey, modifying roadway geometry, drainage improvements, traffic signal modernization, improved lighting, pedestrian and bicycle accommodations, ADA improvements, and all other related work to complete Phase II contract plans. The completion date for this contract will be 24 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 003 - RFQ Engineering - Phase II Engineering Project, FAI 290 (Eisenhower Expressway) at Ridgeland Avenue and Western Avenue

Design

Bridges / Tunnels

$700,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
100
Bidding Soon
2,069
All Active Projects
889
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

img_map_placeholder

Multiple Locations, Schaumburg, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.