BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wilmington, North Carolina. Conceptual plans call for site work for a water / sewer project.

The scope of work is expected to include the services described below. No guarantee is expressed or implied by the CFPUA that all services will be performed or that the selected consultant will perform all services associated with the project. The CFPUA may terminate work or pursue other consultant selections at any phase of the project. CFPUA Meter Services has conducted preliminary evaluations and established a priority list for the water meter vault replacements. The vaults and meters will be replaced in the following locations: 1. 5140 Carolina Beach Road- 4" Meter 2. 4412 Lake Avenue- 4" Meter 3. 6520 Market Street- 4" Meter 4. 501, 505,509,513 Cobblestone Drive- All 3" meters 5. 5002,5006,5009,5010,5013 McClelland Drive- All 3" meters CFPUA will follow a qualifications-based selection process. Consultants must demonstrate their level of competence and qualification, and each sub-consultant's level of competence and qualification, with respect to the listed evaluation factors for the needed services. Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting services of large meter vault replacement for ageing water meter vaults throughout CFPUA's system. The project will generally consist of reviewing CFPUA's replacement priority list, developing contract drawings and technical specifications, obtaining necessary permits and encroachments, assisting in the bidding process, and providing construction administration and observation-based services. CFPUA will address questions regarding the RFQ until 2:00 PM on September 6, 2022. Questions submitted after this time will not addressed. Questions concerning this advertisement should be directed to Julia Faircloth, Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org. The method of contractor selection has not been determined at this time

Conceptual

Water / Sewer

$175,505.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
34
Bidding Soon
436
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

img_map_placeholder

Multiple Locations, Wilmington, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.