BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Puyallup, Washington. Completed plans call for site work for a water / sewer project.

QUOTE SPECIFICATIONS AND SCOPE OF WORK 1. Complete demolition of the main structure and all out buildings. Demo is required of ALL structures within the RED border of the overhead photo. The gas and electric has been disconnected. This is a Fast Track project which means the demo must be completely finished and cleaned up by September 30, 2022. 2. Removal of all debris, equipment, vehicles, tires, concrete blocks, rubbish, dead trees, brush, stumps and materials from the site. Absolutely none of these listed items nor any of the building debris, nor other trash or debris may be buried or left to remain on the property under any circumstance. 3. Proper disposal must be used for all debris, equipment, vehicles, tires, concrete blocks, rubbish, appliances, trees, trash, materials, etc. in commercial landfills. Burning of any type is not authorized at the site. Valued scrap material may be salvaged for later sale, but must be removed from the site by the Contractor at the time of demolition. Landfill tickets accounting for all project demolition debris must be submitted with requests for payment. Building debris must be taken to a properly licensed landfill within forty-eight (48) hours of removal from the site. 4. As part of the quote documents, the Winnebago County Health Department has ordered an asbestos inspection. Attached are copies of the asbestos inspection reports indicating the presence or absence of asbestos in each building. If present, the Bidder is responsible for proper abatement of such asbestos. All asbestos removal shall be performed in accordance with EPA regulations. When asbestos abatement is required, confirmation must be provided to the Winnebago County Health Department (WCHD), by the licensed asbestos abatement contractor, that the abatement has been completed prior to the beginning of any demolition. The licensed State of Illinois Asbestos Abatement Contractor shall remove and dispose of any identified asbestos in accordance with OSHA, EPA, DNR, Federal, State, and local requirements. Any HVAC or refrigeration equipment, and any unknown liquids or materials encountered on the property shall be properly handled, removed and disposed of by the contractor or a subcontractor utilizing appropriate approved procedures including hazardous materials procedures. 5. All foundation walls shall be removed to a uniform depth of at least three (3) feet below grade. Foundations, footings, steps and sidewalks of concrete, brick, block, etc., can be used as clean fill material. This rubble must be inspected by the WCHD prior to covering. 6. Contractor is responsible for identifying the location of wells and/or septic systems on the property.A WCHD Site Verification form must be completed. WCHD Site Verification Fees have NOT been waived. WCHD has no records/information on the existing well & septic. 7. Septic tanks on the property must be pumped dry by licensed septic pumper prior to demolition.Septic tank tops and one side shall be caved in and immediately filled with sand, gravel or similar material. The abandonment of the septic tank and the fill must be inspected by the WCHD and/orphotographed and submitted to the WCHD with pumping receipts. The area is to be covered with top soil to make level to grade. 8. Wells must be properly abandoned by a licensed well contractor. A permit for well sealing must be obtained from the WCHD; well sealing fees have NOT been waived. The WCHD must be given forty-eight COUNTY OF WINNEBAGO, ILLINOIS(48) hour notice prior to sealing. A State of Illinois Water Well Sealing form must be completed and submitted to the WCHD within thirty (30) days of sealing. 9. Underground Tanks. In the event that underground storage tanks exist within the building to be removed, or on the premises of the same, in accordance with State Fire Marshall regulations, unless otherwise directed by the WCHD, shall be removed and disposed of by the Contractor. This work will not be paid for separately, but shall be considered as incidental to the contract and no additional compensation will be allowed. 10. After removal of all materials, level lot to adjacent grades. Remove and dispose of brush, plant material and trees in the demolition area less than four (4) inches in diameter. Live trees, larger thanfour (4) inches in diameter, shall remain undisturbed. All stumps must be removed. Clean earth fill material may be required to bring the lot to grade. The lot must be finish graded to a condition to allow proper drainage and mowing. Application of grass seed on the property is required after finish grading. Contractor is responsible for contacting the Winnebago County Building Department for final inspection following completion. 11. The Contractor is responsible for all utilities on the property including properly capping any domestic wells and other water sources. Contractor shall notify all utility companies, as well as J.U.L.I.E., of impending demolition and excavation and shall follow their instructions on utility overhead and buried lines and equipment. Contractor shall remove all underground utilities prior to commencing excavation. WCHD will be responsible for the disconnection of electrical and natural gas services. Confirmation of disconnections will be provided to the Contractor by WCHD.

Bid Results

Water / Sewer

$42,110.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
46
Bidding Soon
735
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.