BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and new construction of a bridge / tunnel in Sheboygan, Wisconsin. Conceptual plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Proposed plans to construct a swing-bridge across the river, connecting the two sides from the Virginia Avenue terminus on the north to the South Pier Boardwalk. As of August 15, 2022, this project is in the early planning phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2023.

Conceptual

Bridges / Tunnels

$5,300,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
67
Bidding Soon
957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

Project location map

Virginia Ave, Sheboygan, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.