BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Lakewood, Colorado. Conceptual plans call for the renovation of a educational facility.

RFQ Design - Replace East Wing Roof, Lakewood Campus, Phase 1 of 2 The design work for this Design-Bid-Build project will be contracted directly with a Roof Consultant firm under the State of Colorado's Architect/Engineer Agreement SC5.1 (Rev 07/2022), along with the Terms and Conditions SC5.1TC (Rev 07/2022). The work will consist of design for BOTH Phases 1 AND 2. Each phase will be competitively bid and constructed separately (only Phase 1 has been funded to date), therefore two sets of construction bid documents will be required. Stamped drawings and specifications must be submitted to Owner's third-party code review consultant for review. Contract Administration scope of work under this Agreement will be for Phase 1 only. It is the Owner's intent to remove the existing 20-year-old ballasted EPDM roof, installing additional insulation to improve R value and installing a new 60 mil fully adhered EPDM or TPO membrane. The total roof square footage for both phases is approximately 90,000 sf; the Consultant will work with the Owner to determine the actual areas included in each phase. It is the Owner's wish that the amount of work in each phase be roughly equal. The final determination on the schedule will be made in conjunction with the selected Consultant, but there are unusual funding constraints on the project, including an abbreviated period of time to encumber all project funds, which must be met. Question Deadline 08/26/2022 at 5:00 PM MT Questions must be in writing to: renee.murillo@rrcc.edu and mark.bana@rrcc.edu The method of contractor selection has not been determined at this time.

Conceptual

Educational

$1,334,055.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
1,009
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

img_map_placeholder

13300 W 6th Ave Frontage Rd, Lakewood, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.