BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Iowa City, Iowa. Completed plans call for the addition of a 38,000-square-foot medical facility; for the demolition of a medical facility; for the renovation of a 52,000-square-foot medical facility; and for site work for a medical facility.

The project budget is $95,000,000.00 The estimated construction budget is $50,400,000.00 Notifications to Short-Listed Proposers: Wednesday, August 31, 2022 RFP Proposals Due: Wednesday, September 21, 2022 at 2:01 PM Central Time Interviews and Opening of Cost Proposals: Friday, September 30, 2022 RFQ Information Meeting (ZOOM Meeting): Friday August, 19 at: 02:00 PM Central Time Join Zoom Meeting https://uiowa.zoom.us/j/98388422027 Any questions relating to the RFQ may be directed to the following individuals: Name: Senior Design Project Manager - Ryan Dehart Facilities Management, Design & Construction Phone: 319- 335-1298 Email: ryan-dehart@uiowa.edu Name. Construction Project Mgr. - Bryan Watson Facilities Management, Design & Construction Phone: 319-467-4269 Email: bryan-watson@uiowa.edu Name: Design Project Manager - Michael LeClere Facilities Management, Design & Construction Phone : 319-467-4536 Email : Michael-LeClere@uiowa.edu The anticipated project schedule (all dates are subject to change as the project is developed): Completion of Schematic Design - Fall 2022 Completion of Design Development Documents - Spring 2023 Begin Construction - Summer 2023 The University of Iowa (Owner) is currently in the Pre-Design and Schematic Design of a project titled UIHC - John Pappajohn Pavilion - L7-L10 - Vertical Expansion of Inpatient Unit and has been authorized by the Board of Regents, State of Iowa to proceed with procurement of Construction Manager Services where the Construction Manager is at-Risk. The Owner intends to retain a Construction Management firm to join the project team during the Design Phase and to continue through the Construction Phase, occupancy, and warranty period of the project. The Owner is requesting submissions from firms who can demonstrate they have resources, experience, and qualifications to provide Construction Management Services for the project. Submissions to the Request For Qualifications (RFQ) for Construction Manager at-Risk (CMaR) services for the UIHC - John Pappajohn Pavilion - L7-L10 - Vertical Expansion of Inpatient Unit project at the University of Iowa, Iowa City, Iowa, shall be received electronically by the Board of Regents, State of Iowa, Facilities Management, Design & Construction, prior to 2:01 p.m. local Iowa time, on the date listed within the RFQ. The UIHC - John Pappajohn Pavilion - L7-L10 - Vertical Expansion of Inpatient Unit project includes an expansion of John Pappajohn Pavilion through the additions of two floors: Level 9 and Level 10 to the existing building. New Construction to be a vertical expansion of the existing tower and includes Level 9 for a 24 Bed ISS/Intensive Care unit and level 10 to become a new mechanical penthouse serving the floors below. The project will fully renovate existing level 8 mechanical spaces and relocate with new equipment to level 10. Renovation of existing Level 7 to become an 18 bed postpartum unit. Level 7 West (west of JPP elevators ) renovated to 8 LDR and 1 OR (C-Section ) Suite and on-call rooms. Level 8 to become a new 18 unit Postpartum Unit. This project scope will include: The project consists of building a new two-story structure on top of the existing eightstory John Pappajohn Pavilion comprising an additional approximately 38,000 square feet. This project includes renovation of two existing levels: Level 7, comprising approximately 33,000 square feet, and Level 8, comprising approximately 19,000 square feet. Renovated space shall include new delivery and post-partum OB/GYN care spaces. A new intensive care unit will be located on the new Level 9 and a mechanical penthouse will be located on new Level 10. The construction will be phased to accommodate current hospital operations.

Award

Medical

$50,400,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
33
Bidding Soon
481
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2022

April 24, 2023

img_map_placeholder

140 Hawkins Dr, Iowa City, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.