BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 31, 2022 at 8:00 PM

Updated October 24, 2023

Site work and asbestos abatement for an educational facility in St George, Utah. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Project Description: Hazardous Materials Abatement as Outlined in the Site Assessment Report Dated May 3, 2022 by Hill West Environmental on All Work Groups Buildings a (to Include Mechanical Tunnels), B, C & D. Phasing and Individual Work Group Breakdowns to Be Provided on U3p on or Before August 19, 2022 Pending Confirmation With the Cmgc Layton Construction and Dfcm Project Management. Construction Cost Estimate: $750,000.00 Individual Work Group Breakdowns: Work Group A: 215,625.00 Work Group B: 178,125.00 Work Group C: 178,125.00 Work Group D: 178,125.00 Question Submission Close Date 8/26/2022 3:00 PM MDT

Post-Bid

Educational

$750,000.00

Public - State/Provincial

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2022

September 30, 2022

Project location map

974 E 100 S, St George, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.