Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Munster, Indiana. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; bridge / tunnel; and bridge / tunnel.
Title: Town of Munster, Indiana Munster Pedestrian Bridge Over Hart Ditch and Cady Marsh Ditch (Des # 1173597) in the LaPorte District. This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Patricia Abbott 1005 Ridge Road Munster, Indiana 46321 (219) 836-6946 pabbott@munster.in.gov Local Public Agency: Town of Munster Project Location: The intersection of the Hart Ditch and Cady Marsh Ditch Project Description: The Town of Munster is going to construct a trail beginning in Munster, south of Schoon Ditch near the intersection of Fisher Street and Crestwood Ave in the NIPSCO Corridor (approximately 4133'7.0"N, 87'28'55.7"W). The Trail will begin at the existing trail that ends on the west side of Hart Ditch and will connect to the Town of Highland on the east side of the Cady Marsh Ditch near the intersection of Lincoln Avenue and Parkway Drive in the NIPSCO Corridor (approximately 4133'7.5"N, 87'28'46.9"W). Additionally, the proposed trail segment will eventually have a leg going south toward Martha Street through the NIPSCO corridor that is located between the Cady Marsh Ditch and Hart Ditch. This fully ADA compliant, non-motorized (bike/pedestrian) trail is anticipated to be a 12-foot wide, asphalt trail, constructed on grade within the floodway of Hart Ditch/Cady Marsh Ditch. The trail will include two separate steel truss pedestrian bridges. Each bridge will be a single span structure to cross the Hart Ditch and Cady Marsh Ditch. The bridges will not have any piers within the waterway. The trail will cross Hart Ditch, set down on grade within the floodway, have a "T" intersection for the south leg to Martha Street through the NIPSCO Corridor, cross Cady Marsh Ditch, and then set back down on grade on the Town of Highland side. The proposed corridor is contained entirely within the NIPSCO Corridor. The existing Munster portion of the trail is located within this corridor. For this reason, coordination with NIPSCO and any other utility companies will be required throughout the construction of this project. INDOT Des #: 1173597 Phases Included: CE Estimated Construction Amount: $1,589,001.07 Funding: Federal Funding for Construction Only Term of Contract: Until Project Completion DBE goal: 3.00% The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Town of Munster, Indiana Munster Pedestrian Bridge Over Hart Ditch and Cady Marsh Ditch
Conceptual
Bridges / Tunnels
$1,589,001.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
Fisher St & Crestwood Ave, Munster, IN
Related To This Project
Munster, IN
Bid Date: Nov 16 2021
Munster, IN
Bid Date: Jan 26 2023
Munster, IN
Bid Date: Apr 04 2023
Munster, IN
--
Munster, IN
--
Munster, IN
Bid Date: Feb 10 2023
Munster, IN
Bid Date: Feb 22 2023
Munster, IN
Bid Date: Aug 12 2022
Munster, IN
--
Munster, IN
--
Munster, IN
Bid Date: Jun 15 2022
Munster, IN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.