Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Farmer City, Illinois. Contact the soliciting agency for additional information.
The City of Farmer City is seeking vendors to remove dead, dying or hazardous trees and stumps in the City right of way. The City estimates that contract will require the removal with ground restoration for 6 trees and 9 stumps this season. No contract shall be awarded except to responsible vendors capable of providing the quality of services desired. The City will award this contract to the vendor that is able to deliver the product specified in this document in a timely fashion for the lowest grand total price. The City reserves the right to reject any and all bids. Within the corporate limits of the City of Farmer City, the vendor will remove dead, dying, diseased and/or hazardous trees located in the City right of way. Upon receipt of the tree removal list, the Vendor is required to remove all trees listed within 180 days. A City representative will plainly mark each tree with an "X" painted on the street side of the tree trunk. The Vendor must notify the City upon completing all tree removals on the list. Removal shall consist of cutting down each tree in a safe manner to a point three inches (3") above the adjacent ground level: If the Vendor deems it necessary, trees should only be dropped "free fall" after receiving prior written authorization from the City of Farmer City representative. Sidewalk, curbs, streets and manhole structures shall always be protected form the impact of falling wood by use of the tree or limb ground supports. Ropes or other mechanical devices shall be used to lower all limbs of sufficient size that may cause damage to other trees or surrounding public or private property. Tree stump removal and restoration: The Vendor shall remove the stumps of all tree removals: Stump and root removal. The vendor shall remove all tree stumps and buttress roots to a depth that is adequate so as to return the area to the grade of the parkway outside the root flare zone. Through November 30, stumps shall be removed, and site restoration completed within five (5) business days of the tree removal date. Stump removal. The site should be restored to the level of the existing parkway and consist of pulverized topsoil and seeding at the time the stump is removed. Debris removal. The Vendor is responsible for the removal and disposal of all debris from a site after removing a tree and returning the site to its original state. Removal and clean up shall include the raking of all lawn areas, sweeping of all streets and sidewalks and hauling away all brush, tree branches, logs, stumps, tree grindings and excess topsoil from all public and private property in and around the area of work. The site shall be returned to the same state in which it existed in prior to removal. The Vendor shall be responsible for maintaining a disposal site for debris resulting from the work executed under this contract. Protection of Property. The Vendor shall take all necessary precautions to eliminate damage to adjacent trees and shrubs, lawns, curbs, walks or other real or personal property. It is recommended that the vendor take before and after pictures of each site in order to confirm or refute any property owner claims for damage as a result of the work being performed. Damage to Public or Private Property. The Vendor is solely responsible for any damage to public or private property caused by the Vendor's operation. The Vendor shall resolve any claims for damage with the property owner within thirty (30) days after damage occurs. Should the damage not be rectified within the time frame agreed upon or to the satisfaction of the City, the City reserves the right to repair or replace that which was damaged caused by the Vendor and deduct these costs from any payment due the Vendor. Failure to report damage to public or private property to the City shall initiate penalties. JULIE notification. The vendor is required to notify JULIE prior to any excavation. Communication. The vendor shall maintain a communication system that consists of both cell phone and wireless email capability at no additional cost to the City (Monday through Friday 8 am to 4 pm). The vendor further agrees to return all calls or message form the City by the end of day. Failure to return a call will result in a reassessment and/or possible cancellation of contractPayment. All invoices shall be submitted to the City within ten (10) days of completion of tree or stumps removals. Bid Questions. All questions shall be submitted via email to smclaughlin@cityoffarmercity.org. Oral explanations or instructions will not be binding. Bid Bond. A Bid Bond in the amount of 10 percent of the Bid amount, shall be submitted by the Contractor. The City reserves the right to reject any and all bids.
Post-Bid
Roads / Highways
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2022
September 7, 2022
Multiple Locations, Farmer City, IL
Related To This Project
Farmer City, IL
Bid Date: Mar 17 2023
Farmer City, IL
Bid Date: Mar 14 2023
Farmer City, IL
Bid Date: Apr 28 2023
Farmer City, IL
--
Farmer City, IL
Bid Date: Jul 28 2023
Farmer City, IL
Bid Date: Aug 08 2023
Farmer City, IL
Bid Date: Aug 25 2023
Farmer City, IL
Bid Date: Jun 28 2022
Farmer City, IL
Bid Date: Aug 26 2020
Farmer City, IL
Bid Date: Jun 17 2022
Farmer City, IL
Bid Date: May 31 2022
Farmer City, IL
Bid Date: Apr 01 2022
Farmer City, IL
Bid Date: Apr 14 2022
Champaign, IL
Bid Date: Aug 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.