Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a clubhouse / community center in Santa Barbara, California. Completed plans call for the renovation of a clubhouse / community center.
As of September 15th, project will be resubmitted through the bid process. No definite date of rebid yet. Replace Hole #5 Men's & Women's Restrooms Door & Framing and Clubhouse Men's & Women's Restrooms Door & Framing. Option to replace Hole 15 Restroom Door and Proshop Door. Pre-Bid Meeting No Online Q&A No License Requirements B Prime Main Project Hole #5:Remove and replace Men's & Ladies Restroom door and framing. Replace with Metal door and frame. 1 Left / 1 Right hinge (inward swinging). Schlage locking mechanism. Hinges. No closer needed. Paint and match building Clubhouse Restroom. Remove and replace Men's & Ladies Restroom door and framing. Remove and replace storage door with ventilation screen. Replace with Metal door and frame. 1 Left / 1 Right hinge (inward swinging). Schlage locking mechanism. Hinges. Closer mechanism requested. Paint and match building Bid Alternate options Hole #15: Remove and replace Men's & Ladies Restroom door and framing. Replace with Metal door and frame. 1 Left / 1 Right hinge (inward swinging). Schleg locking mechanism. No closer needed. Hinges. Paint and match building Proshop: Remove and replace cart barn facing door. Replace with Metal door and frame. Closer requested CRL. Restroom Door Specs. Doors: for both men's and women's restrooms Install new Steel Craft L series honeycomb door - 16 gauge seamless frame (welded seams) - A60 galvanized, and Install new Steel Craft 14 gage A60 galvanized steel seamless, door frame (welded seams), reinforced with 7 gauge reinforcing for all hardware, and factory primed. Include an integral louvered side lite. Match existing nine inch frame depth. Door Hardware: for both men's and women's restrooms on steel door Hinges - 3 each, Ives CB Series butt hinges 4 1/2 " x 4 1/2 " LCN 4041 Closer cush hold open with 90 degree and 110 degree opening stops Push plates SS Satin (626) finish (N) Schlage Falcon B series I.C. Deadbolt. Must comply with CBC 11B-309. Pull handle SS Satin (626) finish, 4x16 escutcheon Kick plates on push side Ives 8400 series, 12" H x 2" less than door width Door bottom- brush gasket Pemko- 18061DNB 3) Door Finishes New paint on door and frame to match existing- one coat rust inhibiting primer and 2 coats of exterior grade enamel. Color to be Oxford Brown from Dunn Edwards paint. New interior plaster. One coat of interior primer and two coats of interior latex to match existing, where required. New wall paint to match existing, one coat of interior latex primer and 2 coats interior latex paint. New exterior cement plaster to match existing in texture and paint color. One coat of exterior primer and two coats of exterior latex to match existing. Patch wall at location of toilet partition demo, and block partition demo as needed for a smooth transition to existing wall. 4) Door Signage New ADA sign for both men's and Women's door. Must meet California ADA code requirements. 5) General requirements: All necessary equipment and incidentals to perform and complete work as per plans and specifications including but not limited to: signage, barricades, fencing and traffic control necessary to protect construction site. All necessary equipment to protect public during construction work All necessary signage and notifications to public or private entities affected by the project Cooperation with City Departments involved or affected by the project 6) Paint a) Doors and, and jamb paint shall be Dunn Edwards Ever shield exterior grade, semi-gloss enamel, color Dunn Edwards Oxford Brown. b) Prime all raw areas prior to applying paint. All Primer to be exterior grade and water based. For metal it shall also have rust inhibitors. c) All materials shall be brought to the job site in the original sealed labeled containers of the paint manufacturer and shall be subject to inspection by the City project manager. Where thinning is necessary, only the product of the manufacturer furnishing the paint shall be used. All such thinning shall be done strictly in accordance with the manufacturer's instructions. All paint shall be applied by experienced painters with brushes or other applicators and without runs, sags, thin spots, or unacceptable marks. Paint shall be applied at the rate specified by the manufacturer to achieve the minimum dry mil thickness required. Additional coats of paint shall be applied, if necessary, to obtain the desired thickness. Application shall be by spraying where recommended by the manufacturer. If the material has thickened or must be diluted for application by spray gun, each coat shall be built up to the same film thickness achieved with undiluted brushed-on material. Where thinning is necessary and approved, only the products of the particular manufacturer furnishing the paint shall be used, and all such thinning shall be done in strict accordance with the manufacturer's instructions. A minimum of 24 hours drying time shall elapse between the application of any two coats of paint or epoxy on a particular surface, unless otherwise recommended by the coating manufacturer. Longer drying times may be required for abnormal conditions in concert with the manufacturer's recommendations.
Bid Results
Clubhouse / Community Centers
$34,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 12, 2022
October 31, 2022
3500 McCaw Ave, Santa Barbara, CA
Related To This Project
Santa Barbara, CA
Bid Date: Oct 27 2022
Santa Barbara, CA
Bid Date: Oct 25 2022
Santa Barbara, CA
Bid Date: Sep 22 2022
Santa Barbara, CA
Bid Date: Oct 06 2022
Santa Barbara, CA
Bid Date: Sep 22 2022
Santa Barbara, CA
--
Santa Barbara, CA
--
Santa Barbara, CA
Bid Date: Sep 28 2022
Santa Barbara, CA
--
Santa Barbara, CA
Bid Date: Oct 13 2022
Santa Barbara, CA
Bid Date: Jan 23 2023
Santa Barbara, CA
Bid Date: Nov 22 2022
Santa Barbara, CA
Bid Date: Oct 11 2022
Santa Barbara, CA
Bid Date: Sep 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.