Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
Site work and paving for a mixed-use development in Wasilla, Alaska. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of February 13, 2025, design is being completed in-house. Although a firm timeline for construction has not been determined, construction is not expected to start prior to summer of 2027. *The closed solicitation has been included below for reference: Vine Rd Recon: KBG Rd to Hollywood Rd & HSIP: Vine Rd at Hollywood Rd Design The Contractor shall provide professional design services for support on the two above-named projects. Vine Road Reconstruction will reconstruct 0.6 miles of existing two-lane rural road from Knik-Goose Bay Road to Hollywood Road to address the increase in traffic volumes. Scope includes reconstructing the roadbed, paving, roadside hardware, drainage improvements, intersection improvements, ADA improvements, and safety improvements as warranted. It may include associated 8 foot shoulders, turn lanes and pedestrian pathway. HSIP: Vine Road at Hollywood Road Intersection Improvements will construct a roundabout at the intersection to mitigate crashes. Services are anticipated to include: Roundabout Design Review, Hydrologic and Hydraulic Design, Landscape Architecture, Plans, Specifications and Engineer's Estimate, Assistance During Bidding, Assistance with Design Project Closeout, and Assistance During Construction. Estimated range (US$): 100,000 to 150,000 Plans room: Central IRIS Program number ............... : CFHWY00323 / CFHWY00463 Federal Project No. 0001605 &0001627 Project Site (City, Village, etc.) ................ : Wasilla, Alaska Anticipated period for performance-Begin/End: September 2022 through December 2028 The method of contractor selection has not been determined at this time. AKDOT - RFP Engineering - Vine Rd Recon: KBG Rd to Hollywood Rd and HSIP: Vine Rd at Hollywood Rd Design *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$150,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
Vine Rd, Wasilla, AK
Related To This Project
Wasilla, AK
Bid Date: Aug 04 2022
Wasilla, AK
Bid Date: Aug 30 2022
Wasilla, AK
--
Wasilla, AK
Bid Date: Aug 04 2022
Wasilla, AK
Bid Date: Sep 08 2022
Wasilla, AK
Bid Date: Dec 06 2022
Wasilla, AK
Bid Date: Jul 27 2022
Wasilla, AK
Bid Date: Aug 02 2022
Wasilla, AK
Bid Date: May 11 2021
Wasilla, AK
Bid Date: Jul 14 2022
Wasilla, AK
Bid Date: Jun 27 2022
Wasilla, AK
Bid Date: Jun 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.