BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Chula Vista, California. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of May 1, 2023, the project is in design. A civil engineer has been selected. The project is anticipated to be advertised for construction bids at the end of 2023 and start construction in the first quarter of 2024. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A Online Q&A No Consultant shall provide professional engineering services to perform Resident Engineering and construction inspection, embodying the necessary qualifications and experience including licensing as a Professional Civil Engineer in the State of California, and shall provide appropriate equipment such as vehicles, personal computers, camera, tools, and personal safety equipment to perform this work. The method of Contractor Selection has not been Determined at this time. The estimated schedule for the selection process is as follows: Aug 19, 2022 (Friday) ...................................................................... Advertise Date Sep 30, 2022 (Friday) ...................................................................... Proposals due Oct 2022 ..................................................................... Notify Shortlisted Proposers Oct 2022 ......................................................... Interviews for Shortlisted Proposers Oct 2022 ....................... Highest-ranking Proposer notified and negotiations begin Dec 2022 ........................................................... Award of Contract by City Council Feb 2023 .................................................................................... Notice to Proceed Dec 2022 ....................................... Anticipated Bridge Improvements Construction ............................................................................... Contract Advertise Date Feb 2023 ................................ Bridge Improvements Construction Contract Award Jul 2023 ................................................... Bridge Improvements Construction Start Feb 2025 ......................................... Bridge Improvements Construction Complete Feb 2026 .................................................................... Plant Establishment Period

Design

Bridges / Tunnels

$30,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
86
Bidding Soon
1,037
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

Project location map

Heritage Rd, Chula Vista, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.