BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Taylor, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construction of a bulb-out on the northwest corner of 2nd Street and Main Street (SH 95), including curb & gutter, concrete sidewalk, pavers, curb ramps, fixed bollards, curb inlet modification, and pedestrian signal poles. Construction services for this project will be selected through competitive sealed proposals in accordance with Chapter 2269, of the Texas Government Code. The City will evaluate and rank the contractors based on the following selection criteria: 30% Contractor Relevant Experience and References, 60% Cost Proposal, and 10% Schedule Proposal. As the project is on the State Highway System, Proposers shall not be debarred by TxDOT. Each Proposal must be accompanied by Proposal Security made payable to Owner in an amount of five percent (5%) of Proposer's total amount Proposed and in the form of a certified or cashier's check or a Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. The expected time for Substantial Completion is 42 calendar days (minimum of 28 days and maximum of 56 days). Questions pertaining to the project shall be collected via email and distributed via addendum.The deadline for questions will be Tuesday, September 6, 2022 by 5 pm. Questions will bedirected to:Contact: Justin Carlton, P.E.Title: Project ManagerE-mail: Justin.Carlton@hdrinc.com

Bid Results

Roads / Highways

$187,559.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
40
Bidding Soon
2,175
All Active Projects
841
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

October 13, 2022

img_map_placeholder

Multiple Locations, Taylor, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.