EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Burley, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Action will be taken by the City within thirty (30) days of the opening date and the successful bidder will be required to enter into a written contract with the City within ten (10) days after Notice of Award of his bid. The City of Burley reserves the right to reject any and all bids or to waive any irregularity in any bid. Each bid will be accompanied by a bid bond or certified check in the amount of 5% of the total bid which will be forfeited to the City if the bidder fails to enter into the contract. Checks of unsuccessful bidders will be returned immediately following award of the contract or 30 days after opening, if no award is made. All contractors submitting bids are required to have a valid Idaho Public Works License prior to bidding and to include the number on the Bid Form. Payment and Performance Bonds each equal to the bid amount are required upon award of Contract. Bidders may ask questions up to 5:00 p.m. on Friday August 12, 2022. All proposals must be submitted on the forms furnished. Contractors are responsible to acquire and review the 2020 Edition of the ISPWC Technical Specifications and the City's modifications to the ISPWC. This project consists of reconstructing about 7300 feet of Bedke Boulevard with asphalt milling and asphalt overlay, remove and replace the entire section of part of the roadway and paving with asphalt and concrete paving with associated labor, materials, and installation. The engineer's estimate for this work is about $2,500,000. A public works license is required. Davis Bacon wages are not required. American Iron and Steel is not required. A list of quantities is available from the City Clerk's Office. This work is financed solely from city funds and is exempt from federal Davis-Bacon wage requirements. The proposed work is to be completed by July 2023 or as directed by the City Engineer.

Award

Roads / Highways

$2,469,852.00

Public - City

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
64
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

April 10, 2023

img_map_placeholder

Bedke Blvd, Burley, ID

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.