BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2023 at 8:00 PM

Updated January 27, 2024

Site work and new construction of a mixed-use development in San Francisco, California. Completed plans call for the construction of a 128,000-square-foot, four-story above grade, 750-bed educational facility; and for site work for a educational facility.

The first building is a new residence hall that provides up to 750 beds of affordable housing for incoming first-year students. The bedrooms should be developed using a pod concept approach. The pod concept provides space to socialize, sleep, study and dine within the scope of intimate community grouping. Depending upon the cost, two (2) three bed pods may share a shower and a water closet. If this proves to be too costly, one or more common bathrooms will be provided on each floor as required. Initial studies conducted by the University indicate that this program can be accommodated within a (4) story, 128,000 GSF building. In addition to the bedrooms, the residential portion of the project will include associated activity and study space, office space for the residence hall administration, meeting rooms, recreational areas, and faculty-in-residence apartments. It is also assumed that a dining hall will be constructed on the ground floor of the building. The project will be designed to include gender equity and shall be accessible by residents with a range of abilities. The second building is the Student Health Center (SHC) and will be studied as an alternate during schematic design. This department is currently located in an antiquated building near the center of campus, next to the Psychology Building. The SHC serves more students and provides more services than the current space can accommodate, so this project seeks to provide approximately 35,000 GSF for a new facility on the second floor of the new building. The SHC shall have its own dedicated entrance at ground level. It will include an elevator that is separate from those that serve the residence hall. The program shall support a wide range of services, including a triage clinic, health and wellness promotion, examination and treatment rooms, mental health support, and the associated spaces for administrative and medical staff. As of September 29, 2023, a general contractor has been selected. Groundbreaking was held in April 2023. Construction is underway and anticipated to be complete and open for students fall 2024.

Under Construction

Educational

$110,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
194
Bidding Soon
2,992
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2023

August 25, 2023

Project location map

Multiple Locations, San Francisco, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.