Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Monterey, California. Completed plans call for the renovation of a municipal facility.
Engineer's Estimated Cost: $800,000 to $1,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. General work desIn general, the work consists of, but is not limited to, replacement of existing 15kv switchgear GE 735 relays with new relays, removal of an existing battery charger, installation of new battery chargers and batteries providing improved system redundancy, installation of new controls and integration into the facility's SCADA system including a switchgear control panel SCADA programming and commissioning for the new relays, testing and reporting of 15kV PG&E switchgear, user training, testing, cleaning, maintenance and service of the existing switchgear, providing, connecting, operating, maintaining and fueling temporary power generators for United States Army Signal Activity Camp Roberts (USASACR) facilities during maintenance and construction activities, providing all diesel generator fuel for the existing diesel generators and topping off fuel when complete, and miscellaneous associated work at such times and locations as required.
Award
Municipal
$1,050,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2022
November 28, 2022
Multiple Locations, Monterey, CA
Related To This Project
Monterey, CA
Bid Date: Oct 11 2022
Monterey, CA
Bid Date: Oct 11 2022
Monterey, CA
Bid Date: Oct 11 2022
Monterey, CA
Bid Date: Dec 08 2022
Monterey, CA
Bid Date: Sep 15 2022
Monterey, CA
Bid Date: Nov 09 2022
Monterey, CA
Bid Date: Oct 25 2022
Monterey, CA
Bid Date: Oct 25 2022
Monterey, CA
Bid Date: Oct 25 2022
Monterey, CA
Bid Date: Oct 04 2022
Monterey, CA
Bid Date: Mar 02 2023
Monterey, CA
Bid Date: Sep 06 2022
Santa Barbara, CA
Bid Date: Nov 22 2022
Sacramento, CA
Bid Date: Mar 16 2023
French Camp, CA
Bid Date: Oct 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.