Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Spartanburg, South Carolina. Conceptual plans call for the construction of a municipal facility.
Update : https://www.spartanburgcounty.org/DocumentCenter/View/101468/Adopted-FY-2024-28-CIP-Book This project is located at the Wellford Landfill and will provide for the construction of the Phase VII Class III MSW Landfill. Phase VII will be constructed in several phases (cells). The initial construction of Phase VII Cell 1A began in May 2018 and was completed and certified for acceptance of waste in December 2019. We are currently under construction of Phase VII Cell 1B which is scheduled to be completed in April 2023. Funding for FY23 and FY24 includes the construction of Phase VII Cell 1B and construction of a new leachate pretreatment system to replace the existing pretreatment facility which has been in service for approximately 25 years. Funding for planning/design in FY27 is included in anticipation of the construction scheduled for FY28. It is anticipated that Phase VII, including all planned cells, will provide disposal until 2040. This project supports Council's strategic vision by being a core component of an overall infrastructure plan. The project benefits employees as well as the citizens of Spartanburg County in that it provides for proper disposal of household waste and recyclables, helps to continue to maintain a safe working environment, and helps to improve the efficiency of the Department. Project is included Spartanburg County FY 2024-2028 Page No 69 --------------------------------------------------------------------------------------------------------------------------------------------------- This project is located at the Wellford Landfill and will provide for the construction of the Phase VII Class III MSW Landfill. Phase VII will be constructed in multiple cells; initial construction began during FY 2018/19. Funding requested for this project provides resources for engineering of the second cell, which began in FY 2020/21. Future cells will require additional capital resources. The current Phase VI MSW landfill is nearing the end of disposal capacity. Once capacity is reached, waste disposal will occur in Phase VII. It is anticipated that Phase VII, including all planned cells, will provide disposal until 2045. This project supports Council's strategic vision by being a core component of an overall infrastructure plan. Solid waste disposal is an important component for any community and this project will help to ensure that disposal capacity is available to residents and businesses through 2045. This project is also a much more cost effective means of providing disposal capabilities than transporting waste to out-of-county landfills and paying for disposal to other entities. Thus, this project helps to ensure that resources are being allocated in the public's best interest. Project is included Project is in Spartanburg County FY 2023-2027 CIP *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$15,595,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, Spartanburg, SC
Related To This Project
Spartanburg, SC
--
Spartanburg, SC
Bid Date: Feb 28 2024
Spartanburg, SC
Bid Date: Feb 12 2024
Spartanburg, SC
Bid Date: Feb 29 2024
Spartanburg, SC
Bid Date: Feb 20 2024
Spartanburg, SC
Bid Date: Feb 29 2024
Spartanburg, SC
Bid Date: Feb 24 2020
Spartanburg, SC
--
Spartanburg, SC
Bid Date: Feb 20 2024
Spartanburg, SC
Bid Date: Feb 19 2024
Spartanburg, SC
Bid Date: Feb 20 2024
Spartanburg, SC
Bid Date: Feb 27 2024
Spartanburg, SC
Bid Date: Feb 13 2024
Spartanburg, SC
Bid Date: Jan 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.