EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 12, 2022 at 7:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a mixed-use development in Valley View, Pennsylvania. Working plans call for site work for a educational facility; and for outdoor lighting for a road / highway.

As of December 12, 2022. This project is reject, No definite time for re-bid. The Work comprises of the Installation of four (4) sets of School Zone Signs and Lighted Signals per PennDOT approved plans, concrete footers below the frost line for signals, break away posts, and signage, workmanship and all appurtenances for a complete job in accordance with the Contract Documents, IBC, ICC, ICC NEC, and all applicable local, state, and federal codes. CLARIFICATION DEADLINE 10/27/2022 12:00 PM LOCATION OF THE WORK: The Work to be constructed hereunder is in front of the Hegins-Hubley Elementary School located at 1801 West Main Street, Valley View, PA 17983 and the Tri-Valley Jr./Sr. High School located at 155 East Main Street, Hegins, PA 17938 SUBMITTAL OF BIDS - The Bids shall be submitted online through PennBid by 11:00 A.M. on September 7, 2022. PLANS School Crossing Signs, Hegins Township, Schuylkill County, Plan Sheet 1 of 2, prepared by Peters Consultants, Inc., 100 Robbins Avenue, Berwick, PA 18603, dated July 11, 2022. PennDOT Permit No. S5-6-36(1), Issued August 8, 2022 School Crossing Signs, Hegins Township, Schuylkill County, Plan Sheet 2 of 2, prepared by Peters Consultants, Inc., 100 Robbins Avenue, Berwick, PA 18603, dated July 11, 2022. PennDOT Permit No. S5-6-37(2), Issued August 8, 2022

Final Planning

Educational

$61,000.00

Public - County

Outdoor Lighting, Site Work

5

21

2

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceramic Tiling
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
111
Bidding Soon
1,562
All Active Projects
687
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

June 1, 2023

img_map_placeholder

Multiple Locations, Valley View, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Installation of School Zone Signs and Signal Lighting

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.