BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hemphill, Texas. Completed plans call for site work for a water / sewer project.

SUMMARY OF WORK Water Plant Demolish existing 33,000 gallon (x 2) tanks and foundation including all labor, equipment, and disposal. Construct a new 66,000 gallon AWWA Bolted Ground Storage Tank, including foundation, labor and materials, excavation, backfill, and site grading. Remove and replace existing tank control fill valve, and isolation valves, including all fittings, valves, labor and materials. Furnish and install yard piping modifications for proposed tank fill and suction lines including valves, connections to new tank, connections to existing piping, excavation, backfill and compaction. Furnish all site work including all site grading, seeding, new chain-link fence, and site cleanup. Ridgewood Waterline Construct approximately 160 linear feet of 2” DR-21 Class 200 PVC water line by open cut outside of pavement including all fittings, thrust blocking, tracer wire, pressure testing, disinfection, bacteriological testing, excavation, connection to existing water lines, flush valves, gate valves, backfill, embedment, surface restoration, and other appurtenances as shown on the contract plans and specifications. Furnish and install air release/vacuum valves as required, restrained joints, valves, fittings, manholes, vents, and all related appurtenances including excavation, backfill as shown on the contract plans and specifications. Install road bore including steel casing under County Road including all fittings, bore pits, backfill, embedment, surface restoration, and other appurtenances as shown on the contract plans and specifications Special Considerations Contractor to coordinate with WSC prior to making connections to existing waterlines, and coordinate at least 72 hours in advance for any shutdowns required for tie-ins. Contractor to coordinate with WSC for actuation of all existing waterline valves. Underground utilities exist near or within the project area. During construction the Contractor shall take the necessary precautions to avoid damaging the existing utilities within the limits of the project site The Contractor shall pay close attention to the project schedule to ensure that the work is completed in a timely manner without delays. Contractor shall restore the construction sites to their original condition or better prior to the project completion and Owner’s acceptance. Contractor to comply with all environmental requirements as included in the plans and specifications.

Post-Bid

Water / Sewer

$107,000.00

Public - City

Site Work

11

12

2

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
34
Bidding Soon
455
All Active Projects
233
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2022

October 21, 2022

May 19, 2023

img_map_placeholder

5137 Fairdale Road, Hemphill, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.