Published September 14, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Prophetstown, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

You are invited to bid on the Sidewalk and Storm Sewer Renovations at the Prophetstown Lyndon Tampico Community Unit School District No.3 building located at 310 West Riverside Drive in Prophetstown Illinois. Demolition and replacement of existing sidewalks, new upgraded storm sewers on the East side of the building. Cleaning of existing brick facade, as well as jetting and interconnection of new systems to existing systems. Lump sum bids will be received as follows: GC-1 General Construction The Owner reserves the right to accept Bidder's Base Bid, accept any one or more of the Bidder's Alternate Bid's, reject any or all Bids, award contract based on its investigation of the Bidder's, as well as acceptance of Alternates all of which the Owner deems to be in its best interest and waive any informalities or minor irregularities in the Bids and waive minor irregularities in the bidding procedure, all at the Owner's discretion. Proposals shall be prepared in accordance with contract documents prepared by Bray Associates Architects, 1465 41 st street Suite 10, Moline IL 61265. A certified check, a cashier's check or a bid bond payable to the Owner in an amount not less than 5% of the maximum bid shall accompany each bid as a guarantee that if the bid is accepted, the Bidder will execute and file the proposed contract and bond within ten days after the award of contract. Prevailing Wage Rates: A. All Contractors must pay the Prevailing Wage Rates as established by the Illinois Department of Labor. Contractor shall submit with each payment request the weekly payroll forms required by the Davis-Bacon Act (40-U.S.C. 327 et seq. (1982)). Payroll form WH-347 or similar information. Payroll forms shall be submitted (one copy) for each person employed on the jobsite by each contractor and all subcontractors. Illinois Preference Act: A. All contractors, subcontractors, and those supplying labor to this project shall comply with the "Employment of Illinois Workers on Public Works Act" (30 ILCS 570/) commonly referred to as the Illinois Preference Act. Estimated construction cost of $75,000

Post-Bid

Sidewalks / Parking Lot

$75,000.00

Public - City

Paving, Site Work

4

16

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
45
Bidding Soon
644
All Active Projects
354
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

September 19, 2022

img_map_placeholder

310 W Riverside Dr, Prophetstown, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sidewalk Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.