EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 15, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a power facility in Imperial, California. Completed plans call for the renovation of a power facility.

As of October 20, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Niland Gas Turbine Units 1 and 2 Balance of Plant Control Communications Upgrade A maximum of two persons per Respondent will be allowed onsite. Attendees are required to wear a facemask throughout the mandatory meeting and job walk. Hardhats, safety glasses, closed toed shoes are required for the site visit, attendees must provide their own safety equipment. Attendees cannot wear shorts or dresses. Respondents will have to answer the Contractor/Consultant Health Questionnaire (attached) at the mandatory meeting location and have temperature checked. If you answer "Yes" to any of the questions, or have a measured forehead temperature of 100.4 or higher you will not be allowed to enter. Questions concerning this Secondary Request for Proposal should be directed in writing, no later than 5:00 p.m., Local Time, Tuesday, September 27, 2022 to Mr. Marty P. Holbrook, purchasing agent, via email to: purchasing@iid.com. Responses to questions received will be provided digitally no later than 5:00 p.m., Local Time, Thursday, September 29, 2022. Imperial Irrigation District (IID), an irrigation district established under Division 11 of the California Water Code, Sections 20500 et seq., that provides non-potable water, farm drainage and power services to the lower southeastern portion of California's desert, is requesting proposals from highly qualified Respondents to: Propose replacement of outdated, obsolete hardware and associated software of the balance of plant (BOP) control that provides all functions required for the reliable and safe operation of the gas turbine generator set. This includes the Open Platform Communications (OPC) server, Human Machine Interface (HMI)s, PLCs, and ethernet switches that must function in coordination to have the units available for start-up and operation. Additional components in the upgrade include a plant process data historian and modern compatible software. A re-engineered communication network will be included to provide a robust and reliable system that will perform as required. Responses will not be accepted from respondents not attending this mandatory meeting (See attached files). Prospective respondents must be present and signed in prior to the start of the mandatory meeting. Anyone not signed in at the official start of the meeting will be considered late and will not be allowed to submit a proposal. Anyone who does not attend the entire mandatory meeting and job walk will not be credited with attending. Substantial completion of the BOP upgrade shall be targeted for completion no later than April 14, 2023. Only persons or firms possessing a current, valid type "A" California Contractor's License will be considered for this work. Contractor's License must be held in the legal name of the firm submitting the response.

Award

Power Plant

$700,000.00

Public - City

Renovation

941

13

25

6

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Commissioning
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
11
Bidding Soon
160
All Active Projects
83
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 17, 2022

img_map_placeholder

To Be Determined, Imperial, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Niland Gas Turbine Units 1 and 2 Balance of Plant Control (BOP) Communications Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.