BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Sunnyside, Washington. Completed plans call for the renovation of a power facility.

QUESTIONS DUE BY DECEMBER 28, 2022 - All questions must be made in writing sent via email to Jay Taylor at jdtaylor@energy-northwet.com . The Site location is 76 North Power Plant Loop, Richland, WA 99354, a nuclear power generating facility. The Work shall be performed inside the Protected Area of Columbia. Work will be performed in a Radiological Controlled Area (RCA). Access to the roof shall be through the RCA Turbine upper roof description: 1. Roof is approximately 45,000 square feet. 2. Roof structure consists of a steel Quick Lock (Q) decking. Existing roofing material consists of ballast blocks on adhered EPDM liner on top of Oriented Strand Board, Isocyanate rigid insulation, vapor barrier and secured with fasteners and batten bars. 4. Typical roof drains used on the roof of the turbine building are ZURN Z-100 ERC with extensions. The diameter of the roof drain is 6". 5. Upper turbine building is 570' above grade, 135' from the ground. 6. Roof structure consists of steel Q decking. The installed new roofing system shall meet or exceed Factory Mutual Class I Fire rating with an I-90 Windstorm rating using Factory Mutual approved components. Work shall include but is not limited to the following: 1. Remove existing concrete pavers. 2. Remove and dispose of the current roofing system, including rigid insulation as required and all associated components. Strip the existing roof system down to the solid roof base. 3. Properly dispose of all materials in dumpsters provided by Energy Northwest. Energy Northwest will provide waste disposal skips on the roof. 4. Roof damage: Energy Northwest does not expect any roof damage based on recent inspections. If there is roof damage, Contractor shall identify and communicate the roof damage to the Technical Representative or designee for review and determination prior to applying the roof. The additional Work may result in an Amendment to the Contract. 5. Clean and prepare roof for the application of the new approved roofing system. 6. Supply and install the new roofing system. The installed new roofing system shall meet or exceed Factory Mutual Class I Fire rating with an I90 Windstorm rating using factory mutual approved components.

Post-Bid

Power Plant

$200,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
123
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

May 5, 2023

img_map_placeholder

76 N Power Plant Loop, Sunnyside, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.