Site work for a playground / park / athletic field in Chino Hills, California. Completed plans call for site work for a playground / park / athletic field.

The Work comprises, but is not limited to: construction of up to four (4) synthetic turf sports fields. Project scope to include mobilization, demolition, removal of existing synthetic turf, construction surveying and staking, earthwork, grading, subbase and subdrain preparation for infields, connection to existing drainlines, and installation of synthetic turf fields as indicated on the construction plans and specifications. Contractor must coordinate with FieldTurf USA, Inc. (FieldTurf) for the installation of the synthetic turf and must allow FieldTurf a minimum of six weeks to complete turf installation. The six-week installation period must be included within the total contract working days. Project Contractor must work in conjunction with FieldTurf installers, and as required, provide a project timeline schedule incorporating final review and approval of aggregate base compaction, infiltration rates, survey and verification of perimeter nailer board prior to the beginning of the six-week allowance for turf installation. For Plans & Specs or Plan Holder's List, contact the Engineering Division at (909) 364-2770 or engineering@chinohills.org. Technical questions regarding this project should be submitted no later than 2:00 p.m. on Thursday, September 1, 2022 to the Project Manager, Ms. Fe Rama, Phone (909) 364-2776, Email, frama@chinohills.org. The Contractor shall possess a valid Class A Contractor's license at the time of submitting bids. The minimum acceptable experience shall include direct responsibility for the grading, drainage and base installation for at least six separate synthetic field turf projects (minimum of 65,000 square feet of contiguous base area per project) within the last three years, and four separate ballfield projects (minimum 2 fields). Separate projects awarded under one contract may qualify as individual projects. Failure to meet the minimum qualification will render a bidder non-responsive. . Working Days - 54. 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. It shall be mandatory, upon the contractor to whom the contract is awarded, and upon any subcontractor under him, to pay not less than the prevailing rate of wages as established by the City Council as they apply to the work being performed. Said prevailing rates are available from the State of California Department of Industrial Relations website

Award

Playgrounds / Parks / Athletic Fields

$1,646,855.00

Public - City

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
117
Bidding Soon
2,182
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2022

November 7, 2022

img_map_placeholder

3280 Eucalyptus Ave, Chino Hills, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.