Site work and paving for a mixed-use development in Encinitas, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Base Bid Improvements on North Coast Highway 101, from Jupiter Street to La Costa Avenue, in the City of Encinitas, in the state of California. The work to be completed involves demolition, pavement removal and reconstruction, pavement grind and overlay, roundabout construction, curbs/gutters, sidewalk construction, bioretention areas, roadway improvements, signing and striping, storm drain improvements, lighting, decorative furnishings and hardscape, landscaping and irrigation, and appurtenances not mentioned above but required in accordance with Contract Documents. This bid package includes seven additive alternates: streetscape improvements between Phoebe Street and Jupiter Street, two parking pods, a DG path from Leucadia Boulevard to Jupiter Street, NCTD bus shelters, sewer rehabilitation, and large storm drain improvements. This project requires cooperation with other construction projects within the project limits. Online Q&A: Yes Q&A Deadline: 01/04/2023 12:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bid Valid 90 days Liquidated Damages $5,000 per day Estimated Bid Value $15,500,000.00 Start/Delivery Date 10 working days from Notice to Proceed Project Duration 380 working days (Base Bid)

Bid Results

Roads / Highways

$26,041,282.00

Public - City

Paving, Site Work

22

23

31

5

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Multiple Seating, Pews and Benches, Benches, Other Furnishings, Site Furnishings
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Drip Irrigation, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees, Planting Accessories, Tree Grates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
128
Bidding Soon
2,201
All Active Projects
929
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

January 31, 2023

img_map_placeholder

Multiple Locations, Encinitas, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Leucadia Streetscape Segment C West

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.