Published March 2, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Springfield, Massachusetts. Completed plans call for the renovation of a educational facility.

The City of Springfield invites all interested, qualified persons or firms capable of providing the requested services, to submit bids to enter into an agreement to provide the modification/renovation of Van Sickle Middle School, 1170 Carew St., Springfield, MA 01104, for a life skills classroom and for the dedicated entrance for a program operating within the school This bid falls under M.G.L. Ch. 149 and other procurement statutes. Estimated value of the contract is approximately $100,000.00. All questions regarding this bid or its specifications must be made in writing and received by the Office of Procurement no later than September 8, 2022 by 4:00 P.M. (hbutton@springfieldcityhall.com) in order to be considered. The City of Springfield supports the goal of twenty percent (20%) MWBE participation applies. Massachusetts Prevailing Wage rates apply. The Chief Procurement Officer or designee reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so. DESCRIPTION OF WORK A. The Work of this Section applies to all Work performed under the Contract. B. Any discrepancies found in the Contract Documents after signing of the Owner-Contractor agreement must be brought to the attention of the Architect for resolution. The Architect will determine which document entry governs and his decision will be final. The Contractor will not be entitled to a change in the Contract Time or Contract Sum on the basis of discrepancies found after signing of the Owner-Contractor agreement. C. Should conflict be evident between Contract Documents or within any Contract Document, the Contractor is deemed to have estimated the more expensive method of doing the Work unless he shall have asked for, and obtained, a written decision prior to submittal of bid or price quote, as to which method or materials will be required. Should the Work proceed after the discovery of errors, conflict, or omission by the Contractor and clarification has not been received from the Architect, the Contractor will be held fully responsible for replacement or correction, as directed by the Architect, at the Contractor's expense.

Award

Educational

$183,350.00

Public - City

Renovation

10

41

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Millwork, Architectural Woodwork, Wood Trim
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Non-Structural Metal Stud Framing, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Acoustical Tile Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Tackboards, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Lifts

Find More Local Projects

Within 75 Miles of This Project
365
Active Projects
214
Bidding Soon
3,718
All Active Projects
1,512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2022

October 19, 2022

img_map_placeholder

1170 Carew St, Springfield, MA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Van Sickle Building Modifications

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.