BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 19, 2022 at 8:00 PM

Updated January 26, 2024

Remodeling and renovation of a military facility in Sierra Vista, Arizona. Completed plans call for the remodel of a military facility.

This is a Design-Build Project The intent of this project is to replace the Building Automation System (BAS) in Building(s) 45001 Main Building, 45005 Dental Clinic, 45006 Ambulatory Clinic and 80503 Miscellaneous Building that meets the requirements of UFC 4-510-01, as well as the Engineering & Design Best Practice Design Guidance. But not limited to please review the scope of work for more information. Magnitude of Construction = $1M - $5M Prevailing Wages Apply. Contract Duration = 365 Calendar Days

Post-Bid

Military

$5,000,000.00

Public - Federal

Remodeling, Renovation

45

5

56

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
10
Bidding Soon
174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

October 10, 2022

Project location map

To Be Determined, Sierra Vista, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.