BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2024 at 8:00 PM

Updated June 8, 2024

Demolition, site work, paving, new construction and addition to a mixed-use development in Marshville, North Carolina. Completed plans call for the demolition of a 5,000-square-foot educational facility; for the addition of a 210,000-square-foot, two-story above grade educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

as of June 7, 2024, this project is under construction by the awarded Construction Manager. From original solicitation: UCPS is requesting qualifications from Construction Management firms interested in providing Construction Management at Risk services for Forest Hills High School. The design is at 95% construction documents. The project scope will likely include: 1. 210,000 sf 2-story new construction and related site improvements. 2. Demolition of approximately 5,000 sf of building. 3. Demolition of some of the existing site improvements to include, but is not limited to, tennis courts, softball field, bus and car parking lots. 4. School houses approximately 900 students and will remain operational throughout construction.

Under Construction

Educational

$96,000,000.00

Public - County

Addition, Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
140
Bidding Soon
1,681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2022

May 6, 2024

Project location map

100 Forest Hills School Rd S, Marshville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.