BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2022 at 8:00 PM

Updated January 26, 2024

Renovation of a water / sewer project in Winter Haven, Florida. Completed plans call for the renovation of a water / sewer project.

For West Clarifier Gear Drive Replacement-WWTP2 Questions concerning this bid must be submitted on or before 2:00 p.m., September 20, 2022, to Brett Martin at bmartin@mywinterhaven.com . Questions received after this time may not be answered. Description: Replace existing West clarifier gear drive and torque mechanism with a new drive and torque mechanism unit provided by the City. Work by Contractor Removal of existing gear drive and torque trip mechanism. This will include, but not limited to disconnecting all wiring to properly remove the gear drive and torque control mechanism, disconnecting all mechanical fasteners required to remove the existing equipment. All work performed shall be in accordance to the manufactures instructions and specifications. Support existing rotor impeller. Install new gear drive and torque trip mechanism according to the manufacturer's instruction including all wiring and mechanical fastening work, balancing, shimming, alignment, etc.to provide a properly working gear drive and torque mechanism in accordance with the manufacturer' instructions and specifications. Contractor is to provide all tools, materials (excluding gear drive and torque mechanism), labor, equipment, etc. that is needed to complete the job. Contractor will be responsible for removing and replacing any and all structural components that are required to replace the gear drive and torque mechanism. Any components that have to be removed and replaced, shallj be done so in a manner so that the finished work will be equal or better than the existing components condition as determined by the City. Contractor is responsible for properly disposing of the old gear drive and torque mechanism offsite. Contractor will be responsible for obtaining and paying for a qualified WesTech technician to perform one (1) day start-up and installation verification service of the new clarifier mechanism. Contractor is to coordinate with operations staff on the location of heavy equipment setup to help prevent damage of existing underground equipment.

Award

Water / Sewer

$49,236.00

Public - City

Renovation

4

3

2

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
177
Bidding Soon
2,824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2022

November 7, 2022

Project location map

2746 Motor Pool Rd, Winter Haven, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.