BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Half Moon Bay, California. Completed plans call for site work for a water / sewer project.

Install of a 4400 linear foot HDPE waterline, well pump, storage tank, well site fence, 2x water meters, pressure reducing valve, and additional hardware necessary to make system operational located at 20080 Cabrillo Hwy South, Half Moon Bay, CA 91019. Construct and install domestic water well infrastructure and waterline at 20080 Cabrillo Highway South, Half Moon Bay. This is located in Midpeninsula Regional Open Space District's Tunitas Creek Open Space Preserve. The scope of the project includes the installation of approximately 4,000 linear feet of 2" HDPE Class 9 waterline and tracer wire that will connect two Christy boxes installed to grade height. The north Christy box location, which is at the end use point, will include pressure reducing valve, shutoff, and an air bleed valve. The waterline will be reduced from HDPE 2" Class 9 to a 3/4 " copper water inlet line connected to house inlet. The south endpoint will terminate at a 4999- gallon low profile green poly tank fed from the new well. Storage tank to well head connection should be included as part of the bid. Contractor is to provide and install a solar well pump system with 2 PV solar panels, backup batteries, transfer switch with connection for emergency generator that would operate pump and construct a five wire (galvanized) livestock fence built to District specifications with a 12-foot access gate around the well site, water tank and pump. The District will provide biomonitoring services. Contractor will communicate and coordinate with District staff to ensure that biological resources are being adequately protected/monitored.

Award

Water / Sewer

$98,000.00

Public - City

Site Work

6

8

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
79
Bidding Soon
1,578
All Active Projects
686
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2022

October 27, 2022

img_map_placeholder

20080 Cabrillo Hwy S, Half Moon Bay, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.